IAC logo
IAC Assessment: NC0635
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0635
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2019
Principal Product Fiberglass truck bodies
NAICS 336211 - Motor Vehicle Body Manufacturing
SIC 3711 - Motor Vehicles And Car Bodies
Sales $100,000,000-$500,000,000
# of Employees 450
Plant Area (Sq.Ft.) 300,000
Annual Production 15,000 Pieces
Production Hrs. Annual 7,200
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,055,144 25,903,000 kWh $0.04
Electricity Demand $485,029 52,355 kW-months/year $9.26
Natural Gas $540,776 129,834 MMBtu $4.17
TOTAL ENERGY COSTS $2,080,949
RECOMMENDED SAVINGS* $24,135 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,442
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$483
Cost:
$600
$350 8,609 $133 14 - - $350
8,609
kWh
$133
14
kW-months/year
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,794
Cost:
$30,000
$5,260 129,246 $4,534 490 - - $5,260
129,246
kWh
$4,534
490
kW-months/year
-
-
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,154
Cost:
$3,120
- - - - $2,154 517 -
-
kWh
-
-
kW-months/year
$2,154
517
MMBtu
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,165
Cost:
$850
- - - - $2,165 519 -
-
kWh
-
-
kW-months/year
$2,165
519
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$9,539
Cost:
$12,600
- - - - $9,539 2,287 -
-
kWh
-
-
kW-months/year
$9,539
2,287
MMBtu
TOTAL RECOMMENDED Savings:
$24,135
Cost:
$47,170
$5,610 137,855 $4,667 504 $13,858 3,323 $5,610
137,855
kWh
$4,667
504
kW-months/year
$13,858
3,323
MMBtu
TOTAL IMPLEMENTED Savings:
$12,442
Cost:
$31,450
$5,610 137,855 $4,667 504 $2,165 519 $5,610
137,855
kWh
$4,667
504
kW-months/year
$2,165
519
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas