IAC logo
IAC Assessment: NC0637
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0637
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2019
Principal Product Water treatment
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 70,000
Annual Production 5,840,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $198,818 7,876,800 kWh $0.03
Electricity Demand $216,531 18,155 kW-months/year $11.93
Electricity Fees $5,140 - $ -
Natural Gas $2,550 186 MMBtu $13.71
TOTAL ENERGY COSTS $423,039
RECOMMENDED SAVINGS* $49,023 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.5122 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS Savings:
$23,778
Cost:
$10,000
$9,204 359,525 $14,574 1,110 - - $9,204
359,525
kWh
$14,574
1,110
kW-months/year
-
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$3,505
Cost:
$30,000
$2,568 100,300 $937 137 - - $2,568
100,300
kWh
$937
137
kW-months/year
-
-
$
03: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$20,241
Cost:
$210,000
$4,485 175,200 $15,756 1,200 - - $4,485
175,200
kWh
$15,756
1,200
kW-months/year
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,499
Cost:
$12,000
- - - - $1,499 - -
-
kWh
-
-
kW-months/year
$1,499
-
$
TOTAL RECOMMENDED Savings:
$49,023
Cost:
$262,000
$16,257 635,025 $31,267 2,447 $1,499 - $16,257
635,025
kWh
$31,267
2,447
kW-months/year
$1,499
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees