IAC logo
IAC Assessment: NC0652
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0652
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2020
Principal Product HVAC Equipment
NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585 - Refrigeration And Heating Equipment
Sales $50,000,000-$100,000,000
# of Employees 208
Plant Area (Sq.Ft.) 280,000
Annual Production 40,000 Pieces
Production Hrs. Annual 2,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,016 1,663,840 kWh $0.06
Electricity Demand $89,835 8,330 kW-months/year $10.78
Electricity Fees $1,367 - $ -
Natural Gas $79,995 11,759 MMBtu $6.80
TOTAL ENERGY COSTS $277,213
RECOMMENDED SAVINGS* $61,129 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,961
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$1,160
Cost:
$100
$1,160 18,202 - - - - - - $1,160
18,202
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$631
Cost:
$700
$631 9,900 - - - - - - $631
9,900
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$465
Cost:
$390
$231 3,623 $234 22 - - - - $231
3,623
kWh
$234
22
kW-months/year
-
-
$
-
-
$
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$11,865
Cost:
$500
$11,865 - - - - - - - $11,865
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$40,922
Cost:
$1,000
$(-49,944) - $89,835 8,330 $1,031 - - - $(-49,944)
-
kWh
$89,835
8,330
kW-months/year
$1,031
-
$
-
-
$
06: 4.512 CONDENSE OPERATION INTO ONE BUILDING Savings:
$6,086
Cost:
$4,800
$1,159 18,200 $1,177 109 - - $3,750 - $1,159
18,200
kWh
$1,177
109
kW-months/year
-
-
$
$3,750
-
$
TOTAL RECOMMENDED Savings:
$61,129
Cost:
$7,490
$(-34,898) 49,925 $91,246 8,461 $1,031 - $3,750 - $(-34,898)
49,925
kWh
$91,246
8,461
kW-months/year
$1,031
-
$
$3,750
-
$
TOTAL IMPLEMENTED Savings:
$12,961
Cost:
$1,590
$12,727 13,523 $234 22 - - - - $12,727
13,523
kWh
$234
22
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes