IAC Assessment: NC0654
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0654
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2020
Principal Product Pharmaceutical preparations
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 500,000
Annual Production 10,000,000 Pieces
Production Hrs. Annual 8,600
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,640,374 49,039,200 kWh $0.05
Electricity Demand $1,158,943 94,772 kW-months/year $12.23
Electricity Fees $(-26,119) - $ -
Natural Gas $727,819 200,297 MMBtu $3.63
TOTAL ENERGY COSTS $4,501,017
RECOMMENDED SAVINGS* $1,453,635 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST Savings:
$1,381,024
Cost:
$8,000,000
$1,924,640 36,800,000 $696,624 55,200 $(-1,240,240) (-341,664) $1,924,640
36,800,000
kWh
$696,624
55,200
kW-months/year
$(-1,240,240)
(-341,664)
MMBtu
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$15,030
Cost:
$75,000
$11,245 215,000 $3,785 300 - - $11,245
215,000
kWh
$3,785
300
kW-months/year
-
-
MMBtu
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$11,303
Cost:
$20,000
$8,456 161,680 $2,847 226 - - $8,456
161,680
kWh
$2,847
226
kW-months/year
-
-
MMBtu
04: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$1,543
Cost:
$6,700
- - - - $1,543 425 -
-
kWh
-
-
kW-months/year
$1,543
425
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$44,735
Cost:
$130,000
$16,684 319,000 $5,606 444 $22,445 6,183 $16,684
319,000
kWh
$5,606
444
kW-months/year
$22,445
6,183
MMBtu
TOTAL RECOMMENDED Savings:
$1,453,635
Cost:
$8,231,700
$1,961,025 37,495,680 $708,862 56,170 $(-1,216,252) (-335,056) $1,961,025
37,495,680
kWh
$708,862
56,170
kW-months/year
$(-1,216,252)
(-335,056)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas