IAC Assessment: NC0655
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0655
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2020
Principal Product Wheel hubs for trucks
NAICS 336120 - Heavy Duty Truck Manufacturing
SIC 3711 - Motor Vehicles And Car Bodies
Sales $100,000,000-$500,000,000
# of Employees 140
Plant Area (Sq.Ft.) 300,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 4,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $296,241 4,257,160 kWh $0.07
Electricity Demand $161,653 15,571 kW-months/year $10.38
Electricity Fees $6,000 - $ -
Natural Gas $49,545 4,650 MMBtu $10.65
TOTAL ENERGY COSTS $513,439
RECOMMENDED SAVINGS* $154,991 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $310
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$92,988
Cost:
$168,000
$117,763 1,692,000 $52,103 5,083 $(-76,878) (-7,216) $117,763
1,692,000
kWh
$52,103
5,083
kW-months/year
$(-76,878)
(-7,216)
MMBtu
02: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$49,654
Cost:
$612,000
$49,444 710,400 $29,520 2,880 $(-29,310) (-2,752) $49,444
710,400
kWh
$29,520
2,880
kW-months/year
$(-29,310)
(-2,752)
MMBtu
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$12,039
Cost:
$500
$77,518 1 $(-65,479) (-1) - - $77,518
1
kWh
$(-65,479)
(-1)
kW-months/year
-
-
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$310
Cost:
$500
$310 4,460 - - - - $310
4,460
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$154,991
Cost:
$781,000
$245,035 2,406,861 $16,144 7,962 $(-106,188) (-9,968) $245,035
2,406,861
kWh
$16,144
7,962
kW-months/year
$(-106,188)
(-9,968)
MMBtu
TOTAL IMPLEMENTED Savings:
$310
Cost:
$500
$310 4,460 - - - - $310
4,460
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas