IAC Assessment: NC0656
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0656
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2021
Principal Product Saw blades
NAICS 332216 - Saw Blade and Handtool Manufacturing
SIC 3425 - Saw Blades And Handsaws
Sales $50,000,000-$100,000,000
# of Employees 475
Plant Area (Sq.Ft.) 225,380
Annual Production 12,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $853,779 12,091,670 kWh $0.07
Electricity Demand $147,031 37,653 kW-months/year $3.90
Electricity Fees $43,971 - $ -
Natural Gas $38,992 4,731 MMBtu $8.24
TOTAL ENERGY COSTS $1,083,773
RECOMMENDED SAVINGS* $84,639 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$21,457
Cost:
$44,289
- - - - $21,457 2,604 -
-
kWh
-
-
kW-months/year
$21,457
2,604
MMBtu
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$39,666
Cost:
$500
- - $39,666 10,042 - - -
-
kWh
$39,666
10,042
kW-months/year
-
-
MMBtu
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$10,304
Cost:
$2,048
$10,304 145,950 - - - - $10,304
145,950
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$13,212
Cost:
$111,000
$8,472 120,000 $4,740 1,200 - - $8,472
120,000
kWh
$4,740
1,200
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$84,639
Cost:
$157,837
$18,776 265,950 $44,406 11,242 $21,457 2,604 $18,776
265,950
kWh
$44,406
11,242
kW-months/year
$21,457
2,604
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas