IAC logo
IAC Assessment: ND0290
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0290
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1997
Principal Product Steel bases and buildings
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 101,000
Annual Production 8,500 Tons
Production Hrs. Annual 5,406
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $112,347 1,922,040 kWh $0.06
Electricity Demand $44,513 5,331 kW-months/year $8.35
Natural Gas $46,830 9,695 MMBtu $4.83
TOTAL ENERGY COSTS $203,690
RECOMMENDED SAVINGS* $8,497 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,347
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Gaseous Waste Administrative Changes Electricity Usage Electricity Demand Natural Gas Gaseous Waste Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,285
Cost:
$2,390
$3,949 67,409 $1,336 160 - - - - - - $3,949
67,409
kWh
$1,336
160
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$698
Cost:
$600
$421 12,016 $277 33 - - - - - - $421
12,016
kWh
$277
33
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$580
Cost:
$100
$580 9,965 - - - - - - - - $580
9,965
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 3.7313 ELIMINATE OXYGEN LOSS Savings:
$479
Cost:
$20
- - - - - - $479 36 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$479
36
lb
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$452
Cost:
$400
$273 7,620 $179 21 - - - - - - $273
7,620
kWh
$179
21
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.7495 INSTALL REPLACEMENT DOORS Savings:
$355
Cost:
$1,050
- - - - $355 64 - - - - -
-
kWh
-
-
kW-months/year
$355
64
MMBtu
-
-
lb
-
-
$
07: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$325
Cost:
-
- - - - - - - - $325 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$325
-
$
08: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$303
Cost:
$335
- - - - $303 55 - - - - -
-
kWh
-
-
kW-months/year
$303
55
MMBtu
-
-
lb
-
-
$
09: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$20
Cost:
-
$12 293 $8 1 - - - - - - $12
293
kWh
$8
1
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$8,497
Cost:
$4,895
$5,235 97,303 $1,800 215 $658 119 $479 36 $325 - $5,235
97,303
kWh
$1,800
215
kW-months/year
$658
119
MMBtu
$479
36
lb
$325
-
$
TOTAL IMPLEMENTED Savings:
$7,347
Cost:
$3,895
$4,541 77,667 $1,344 161 $658 119 $479 36 $325 - $4,541
77,667
kWh
$1,344
161
kW-months/year
$658
119
MMBtu
$479
36
lb
$325
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Gaseous Waste Administrative Changes Electricity Usage Electricity Demand Natural Gas Gaseous Waste Administrative Changes