Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Notre Dame Univ. |
---|---|
Assessment Year | 1998 |
Principal Product | Plastic fabric |
NAICS | n/a |
SIC | 2241 - Narrow Fabric Mills |
Sales | $10,000,000-$50,000,000 |
# of Employees | 66 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 5,500,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | IN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $34,189 | 1,179,953 | kWh | $0.03 |
Electricity Demand | $26,238 | 2,507 | kW-months/year | $10.47 |
Natural Gas | $6,555 | 1,157 | MMBtu | $5.67 |
TOTAL ENERGY COSTS | $66,982 | |||
RECOMMENDED SAVINGS* | $13,977 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $11,897 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $5,258 Cost: $300 |
$5,258 | 79,426 | - | - | - | - | - | - | - | - | - | - |
$5,258 79,426 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM |
Savings: $2,729 Cost: - |
- | - | - | - | $2,729 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,729 - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,570 Cost: $40 |
$1,570 | 30,188 | - | - | - | - | - | - | - | - | - | - |
$1,570 30,188 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.811 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS |
Savings: $905 Cost: $250 |
- | - | - | - | $905 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$905 - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $802 Cost: $500 |
$802 | 12,016 | - | - | - | - | - | - | - | - | - | - |
$802 12,016 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $540 Cost: - |
- | - | - | - | - | - | - | - | $540 | 12,000 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$540 12,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $486 Cost: $750 |
$153 | 5,275 | $295 | 28 | - | - | - | - | - | - | $38 | - |
$153 5,275 kWh |
$295 28 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
$38 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4311 RECOVER MECHANICAL ENERGY |
Savings: $466 Cost: $600 |
- | - | - | - | - | - | $466 | 83 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$466 83 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7122 DISCONNECT BALLASTS |
Savings: $423 Cost: $160 |
$423 | 8,206 | - | - | - | - | - | - | - | - | - | - |
$423 8,206 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $350 Cost: $550 |
$173 | 3,224 | - | - | - | - | - | - | - | - | $177 | - |
$173 3,224 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
$177 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $295 Cost: $800 |
$295 | 9,672 | - | - | - | - | - | - | - | - | - | - |
$295 9,672 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT |
Savings: $107 Cost: $450 |
- | - | - | - | - | - | - | - | $107 | 6 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$107 6 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $46 Cost: $78 |
$7 | 293 | - | - | - | - | $39 | 7 | - | - | - | - |
$7 293 kWh |
- - kW-months/year |
- - $ |
$39 7 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $13,977 Cost: $4,478 |
$8,681 | 148,300 | $295 | 28 | $3,634 | - | $505 | 90 | $647 | 12,006 | $215 | - | $8,681 148,300 kWh |
$295 28 kW-months/year |
$3,634 - $ |
$505 90 MMBtu |
$647 12,006 lb |
$215 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $11,897 Cost: $2,268 |
$7,790 | 127,198 | $295 | 28 | $2,729 | - | $505 | 90 | $540 | 12,000 | $38 | - | $7,790 127,198 kWh |
$295 28 kW-months/year |
$2,729 - $ |
$505 90 MMBtu |
$540 12,000 lb |
$38 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost |