IAC logo
IAC Assessment: ND0307
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0307
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1998
Principal Product Flat-rolled Steel
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 96,400
Annual Production 230,000 Tons
Production Hrs. Annual 8,640
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $145,577 2,666,764 kWh $0.05
Electricity Demand $57,791 5,450 kW-months/year $10.60
TOTAL ENERGY COSTS $203,368
RECOMMENDED SAVINGS* $65,102 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$327
Cost:
$400
$146 2,638 $39 4 - - $142 - - - $146
2,638
kWh
$39
4
kW-months/year
-
-
$
$142
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$792
Cost:
$2,640
$560 21,981 $232 22 - - - - - - $560
21,981
kWh
$232
22
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,847
Cost:
$8,000
$2,242 41,032 $605 57 - - - - - - $2,242
41,032
kWh
$605
57
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,424
Cost:
$900
$3,424 62,720 - - - - - - - - $3,424
62,720
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$7,112
Cost:
$250
- - - - $7,112 - - - - - -
-
kWh
-
-
kW-months/year
$7,112
-
$
-
-
$
-
-
$
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$46,021
Cost:
$15,765
$5,308 61,841 $4,187 395 - - - - $36,526 - $5,308
61,841
kWh
$4,187
395
kW-months/year
-
-
$
-
-
$
$36,526
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,579
Cost:
$6,640
- - $4,579 - - - - - - - -
-
kWh
$4,579
-
kW-months/year
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$65,102
Cost:
$34,595
$11,680 190,212 $9,642 478 $7,112 - $142 - $36,526 - $11,680
190,212
kWh
$9,642
478
kW-months/year
$7,112
-
$
$142
-
$
$36,526
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost