IAC Assessment: ND0309
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0309
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1998
Principal Product Injection-Molded Plastic Parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 87,000
Annual Production 10,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Demand $227,719 18,074 kW-months/year $12.60
Electricity Fees $341 - $ -
Natural Gas $4,173 814 MMBtu $5.13
TOTAL ENERGY COSTS $238,384
RECOMMENDED SAVINGS* $25,751 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,093
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (non-haz) Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (non-haz) Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ lb $ Tgal
01: 2.8112 COMBINE UTILITY METERS Savings:
$12,379
Cost:
$24,759
- - - - $12,379 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$12,379
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,616
Cost:
$17,376
$3,186 75,029 $1,430 178 - - - - - - - - - - $3,186
75,029
kWh
$1,430
178
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
Tgal
03: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$3,750
Cost:
$125
- - - - - - - - - - $3,750 15 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$3,750
15
lb
-
-
Tgal
04: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$1,604
Cost:
$2,500
- - - - - - - - - - - - $1,604 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
$1,604
-
Tgal
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,366
Cost:
$1,000
$913 24,033 $453 48 - - - - - - - - - - $913
24,033
kWh
$453
48
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
Tgal
06: 3.8211 CONVERT TO AQUEOUS CLEANING SYSTEM Savings:
$848
Cost:
$100
- - - - - - - - $848 270 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$848
270
gal
-
-
lb
-
-
Tgal
07: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$478
Cost:
-
- - - - $478 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$478
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
Tgal
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$458
Cost:
$800
$329 7,620 $129 15 - - - - - - - - - - $329
7,620
kWh
$129
15
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
Tgal
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$131
Cost:
$60
$131 2,345 - - - - - - - - - - - - $131
2,345
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
Tgal
10: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$101
Cost:
$250
$161 2,638 - - - - $(-60) (-12) - - - - - - $161
2,638
kWh
-
-
kW-months/year
-
-
$
$(-60)
(-12)
MMBtu
-
-
gal
-
-
lb
-
-
Tgal
11: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$20
Cost:
$20
$20 293 - - - - - - - - - - - - $20
293
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
Tgal
TOTAL RECOMMENDED Savings:
$25,751
Cost:
$46,990
$4,740 111,958 $2,012 241 $12,857 - $(-60) (-12) $848 270 $3,750 15 $1,604 - $4,740
111,958
kWh
$2,012
241
kW-months/year
$12,857
-
$
$(-60)
(-12)
MMBtu
$848
270
gal
$3,750
15
lb
$1,604
-
Tgal
TOTAL IMPLEMENTED Savings:
$6,093
Cost:
$17,556
$3,337 77,667 $1,430 178 $478 - - - $848 270 - - - - $3,337
77,667
kWh
$1,430
178
kW-months/year
$478
-
$
-
-
MMBtu
$848
270
gal
-
-
lb
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ lb $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (non-haz) Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (non-haz) Water Consumption