IAC Assessment: ND0319
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0319
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1999
Principal Product Electromagnetic Coils
NAICS n/a
SIC 3677 - Electronic Coils And Transformers
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 200,000
Annual Production 1,000 Thousand Feet
Production Hrs. Annual 6,240
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,075 1,620,164 kWh $0.04
Electricity Demand $36,850 5,955 kW-months/year $6.19
Natural Gas $11,385 2,320 MMBtu $4.91
TOTAL ENERGY COSTS $105,310
RECOMMENDED SAVINGS* $7,121 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $912
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas LPG Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,025
Cost:
$10,705
$3,894 111,665 $1,131 15 - - - - - - $3,894
111,665
kWh
$1,131
15
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$63
Cost:
$65
$63 1,758 - - - - - - - - $63
1,758
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.7145 INSTALL SKYLIGHTS Savings:
$535
Cost:
$420
$99 2,052 - - $436 89 - - - - $99
2,052
kWh
-
-
kW-months/year
$436
89
MMBtu
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$411
Cost:
$30
$306 8,792 $105 17 - - - - - - $306
8,792
kWh
$105
17
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$380
Cost:
$440
$191 5,569 $47 8 - - - - $142 - $191
5,569
kWh
$47
8
kW-months/year
-
-
MMBtu
-
-
MMBtu
$142
-
$
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$155
Cost:
$40
$115 3,224 $40 6 - - - - - - $115
3,224
kWh
$40
6
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$283
Cost:
$510
$149 4,396 $223 36 $(-89) (-18) - - - - $149
4,396
kWh
$223
36
kW-months/year
$(-89)
(-18)
MMBtu
-
-
MMBtu
-
-
$
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$269
Cost:
$450
$114 3,224 $223 36 - - $(-68) (-14) - - $114
3,224
kWh
$223
36
kW-months/year
-
-
MMBtu
$(-68)
(-14)
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$7,121
Cost:
$12,660
$4,931 140,680 $1,769 118 $347 71 $(-68) (-14) $142 - $4,931
140,680
kWh
$1,769
118
kW-months/year
$347
71
MMBtu
$(-68)
(-14)
MMBtu
$142
-
$
TOTAL IMPLEMENTED Savings:
$912
Cost:
$645
$633 18,170 $368 59 $(-89) (-18) - - - - $633
18,170
kWh
$368
59
kW-months/year
$(-89)
(-18)
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas LPG Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas LPG Ancillary Material Cost