IAC logo
IAC Assessment: ND0320
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0320
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1999
Principal Product Hang Tabs
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 77
Plant Area (Sq.Ft.) 90,000
Annual Production 800,000,000 Pieces
Production Hrs. Annual 2,970
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $40,171 1,098,476 kWh $0.04
Electricity Demand $72,156 6,560 kW-months/year $11.00
Natural Gas $7,816 1,716 MMBtu $4.55
TOTAL ENERGY COSTS $120,143
RECOMMENDED SAVINGS* $6,385 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,637
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Wood Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Wood Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$131
Cost:
-
$58 1,758 $73 7 - - - - - - - - $58
1,758
kWh
$73
7
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$695
Cost:
$1,893
$297 8,499 $398 36 - - - - - - - - $297
8,499
kWh
$398
36
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$303
Cost:
$600
$133 3,810 $170 15 - - - - - - - - $133
3,810
kWh
$170
15
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$737
Cost:
$255
$497 8,206 $240 22 - - - - - - - - $497
8,206
kWh
$240
22
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$320
Cost:
$80
$274 3,224 $46 4 - - - - - - - - $274
3,224
kWh
$46
4
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$451
Cost:
$455
$155 4,396 $66 6 - - - - $230 - - - $155
4,396
kWh
$66
6
kW-months/year
-
-
MMBtu
-
-
MMBtu
$230
-
$
-
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$100
Cost:
$153
$100 2,931 - - - - - - - - - - $100
2,931
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,251
Cost:
$1,600
$312 8,792 $1,188 108 $(-249) (-55) - - - - - - $312
8,792
kWh
$1,188
108
kW-months/year
$(-249)
(-55)
MMBtu
-
-
MMBtu
-
-
$
-
-
$
09: 4.222 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW Savings:
$969
Cost:
$1,376
$249 3,810 $172 12 - - - - - - $548 - $249
3,810
kWh
$172
12
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$548
-
$
10: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,428
Cost:
$125
- - - - - - $1,428 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,428
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$6,385
Cost:
$6,537
$2,075 45,426 $2,353 210 $(-249) (-55) $1,428 - $230 - $548 - $2,075
45,426
kWh
$2,353
210
kW-months/year
$(-249)
(-55)
MMBtu
$1,428
-
MMBtu
$230
-
$
$548
-
$
TOTAL IMPLEMENTED Savings:
$2,637
Cost:
$3,283
$1,414 29,893 $993 90 - - - - $230 - - - $1,414
29,893
kWh
$993
90
kW-months/year
-
-
MMBtu
-
-
MMBtu
$230
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Wood Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Wood Ancillary Material Cost One-time Revenue or Avoided Cost