Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Notre Dame Univ. |
---|---|
Assessment Year | 1999 |
Principal Product | Milled wheat |
NAICS | n/a |
SIC | 2041 - Flour And Other Grain Mill Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 32 |
Plant Area (Sq.Ft.) | 20,022 |
Annual Production | 73,000,000 Pounds |
Production Hrs. Annual | 8,736 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $178,040 | 5,290,446 | kWh | $0.03 |
Electricity Demand | $116,345 | 12,049 | kW-months/year | $9.66 |
Electricity Fees | $12,301 | - | $ | - |
Natural Gas | $24,732 | 6,768 | MMBtu | $3.65 |
TOTAL ENERGY COSTS | $331,418 | |||
RECOMMENDED SAVINGS* | $14,903 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $161 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $639 Cost: $1,458 |
$458 | 13,482 | $181 | 19 | - | - | - | - | - | - |
$458 13,482 kWh |
$181 19 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2211 USE OPTIMUM TEMPERATURE |
Savings: $161 Cost: - |
$42 | 1,172 | $119 | 12 | - | - | - | - | - | - |
$42 1,172 kWh |
$119 12 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $1,357 Cost: $1,250 |
$584 | 17,292 | $1,043 | 108 | $(-270) | (-74) | - | - | - | - |
$584 17,292 kWh |
$1,043 108 kW-months/year |
$(-270) (-74) MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.222 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW |
Savings: $2,056 Cost: $38,197 |
$1,449 | 43,083 | $607 | 59 | - | - | - | - | - | - |
$1,449 43,083 kWh |
$607 59 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $10,625 Cost: $4,000 |
- | - | - | - | - | - | - | - | $10,625 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$10,625 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.8211 CONVERT TO AQUEOUS CLEANING SYSTEM |
Savings: $65 Cost: $20 |
- | - | - | - | - | - | $65 | 8 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$65 8 gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $14,903 Cost: $44,925 |
$2,533 | 75,029 | $1,950 | 198 | $(-270) | (-74) | $65 | 8 | $10,625 | - | $2,533 75,029 kWh |
$1,950 198 kW-months/year |
$(-270) (-74) MMBtu |
$65 8 gal |
$10,625 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $161 Cost: - |
$42 | 1,172 | $119 | 12 | - | - | - | - | - | - | $42 1,172 kWh |
$119 12 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Primary Product |