IAC logo
IAC Assessment: ND0328
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0328
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1999
Principal Product Gray Iron Castings
NAICS n/a
SIC 3321 - Gray And Ductile Iron Foundries
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 87,000
Annual Production 18,760 Tons
Production Hrs. Annual 7,200
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $535,414 16,765,827 kWh $0.03
Electricity Demand $293,214 47,080 kW-months/year $6.23
Natural Gas $54,246 15,116 MMBtu $3.59
TOTAL ENERGY COSTS $882,874
RECOMMENDED SAVINGS* $31,243 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,994
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 4.2220 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW Savings:
$12,717
Cost:
$27,395
$1,465 41,032 $426 69 - - - - - - - - $10,826 - $1,465
41,032
kWh
$426
69
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$10,826
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,575
Cost:
$1,100
$6,644 185,815 $1,931 310 - - - - - - - - - - $6,644
185,815
kWh
$1,931
310
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
03: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$6,212
Cost:
$7,590
$(-2,484) (-69,461) $(-721) (-116) - - - - $9,616 - $(-199) - - - $(-2,484)
(-69,461)
kWh
$(-721)
(-116)
kW-months/year
-
-
MMBtu
-
-
lb
$9,616
-
$
$(-199)
-
$
-
-
$
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$912
Cost:
$950
$707 19,637 $205 33 - - - - - - - - - - $707
19,637
kWh
$205
33
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$892
Cost:
$200
$892 24,912 - - - - - - - - - - - - $892
24,912
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$748
Cost:
$250
- - $748 120 - - - - - - - - - - -
-
kWh
$748
120
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$489
Cost:
$1,068
$377 10,551 $112 18 - - - - - - - - - - $377
10,551
kWh
$112
18
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
08: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$285
Cost:
-
- - - - - - - - $285 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$285
-
$
-
-
$
-
-
$
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$293
Cost:
$350
$101 2,931 $235 38 $(-43) (-12) - - - - - - - - $101
2,931
kWh
$235
38
kW-months/year
$(-43)
(-12)
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
10: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$120
Cost:
$75
- - - - - - $120 3,200 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$120
3,200
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$31,243
Cost:
$38,978
$7,702 215,417 $2,936 472 $(-43) (-12) $120 3,200 $9,901 - $(-199) - $10,826 - $7,702
215,417
kWh
$2,936
472
kW-months/year
$(-43)
(-12)
MMBtu
$120
3,200
lb
$9,901
-
$
$(-199)
-
$
$10,826
-
$
TOTAL IMPLEMENTED Savings:
$20,994
Cost:
$36,260
$(-312) (-8,792) $658 106 - - $120 3,200 $9,901 - $(-199) - $10,826 - $(-312)
(-8,792)
kWh
$658
106
kW-months/year
-
-
MMBtu
$120
3,200
lb
$9,901
-
$
$(-199)
-
$
$10,826
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost