IAC logo
IAC Assessment: ND0329
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0329
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1999
Principal Product Fire Fighting Nozzles
NAICS n/a
SIC 3569 - General Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 80,000
Annual Production 2,500 Pieces
Production Hrs. Annual 4,160
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $83,953 1,331,770 kWh $0.06
Electricity Demand $31,363 3,828 kW-months/year $8.19
Natural Gas $4,061 718 MMBtu $5.66
TOTAL ENERGY COSTS $123,958
RECOMMENDED SAVINGS* $48,868 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,768
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Water Disposal Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Water Disposal Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ $ $ Tgal $ $ $ $ $ $
01: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$40,000
Cost:
$18,000
- - - - - - - - - - $40,000 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
$
$40,000
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$720
Cost:
$7,006
$621 5,862 $99 12 - - - - - - - - - - $621
5,862
kWh
$99
12
kW-months/year
-
-
$
-
-
Tgal
-
-
$
-
-
$
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,442
Cost:
$5,000
$2,442 44,549 - - - - - - - - - - - - $2,442
44,549
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
$
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,236
Cost:
$1,500
$1,236 21,981 - - - - - - - - - - - - $1,236
21,981
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
$
-
-
$
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,296
Cost:
$300
$898 16,413 $398 43 - - - - - - - - - - $898
16,413
kWh
$398
43
kW-months/year
-
-
$
-
-
Tgal
-
-
$
-
-
$
-
-
$
06: 3.4151 MINIMIZE WATER USAGE Savings:
$870
Cost:
$1,400
- - - - - - $870 98,800 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$870
98,800
Tgal
-
-
$
-
-
$
-
-
$
07: 3.4151 MINIMIZE WATER USAGE Savings:
$878
Cost:
$2,300
- - - - - - $755 85,800 $200 - - - $(-77) - -
-
kWh
-
-
kW-months/year
-
-
$
$755
85,800
Tgal
$200
-
$
-
-
$
$(-77)
-
$
08: 4.811 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS Savings:
$658
Cost:
$250
- - - - $658 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$658
-
$
-
-
Tgal
-
-
$
-
-
$
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$587
Cost:
$100
$587 10,844 - - - - - - - - - - - - $587
10,844
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
$
-
-
$
-
-
$
10: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$181
Cost:
$390
- - - - - - - - $181 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$181
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$48,868
Cost:
$36,246
$5,784 99,649 $497 55 $658 - $1,625 184,600 $381 - $40,000 - $(-77) - $5,784
99,649
kWh
$497
55
kW-months/year
$658
-
$
$1,625
184,600
Tgal
$381
-
$
$40,000
-
$
$(-77)
-
$
TOTAL IMPLEMENTED Savings:
$40,768
Cost:
$18,490
$587 10,844 - - - - - - $181 - $40,000 - - - $587
10,844
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$181
-
$
$40,000
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Water Disposal Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Water Disposal Personnel Changes Administrative Changes Primary Raw Material