Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Notre Dame Univ. |
---|---|
Assessment Year | 1999 |
Principal Product | Vitreous china plumbing fixtures |
NAICS | n/a |
SIC | 3261 - Vitreous Plumbing Fixtures |
Sales | $10,000,000-$50,000,000 |
# of Employees | 203 |
Plant Area (Sq.Ft.) | 500,000 |
Annual Production | 1,000,000 Pieces |
Production Hrs. Annual | 4,420 |
Location (State) | IN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $140,795 | 8,621,044 | kWh | $0.02 |
Electricity Demand | $183,079 | 16,541 | kW-months/year | $11.07 |
Natural Gas | $649,748 | 187,783 | MMBtu | $3.46 |
TOTAL ENERGY COSTS | $973,622 | |||
RECOMMENDED SAVINGS* | $13,487 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,942 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $2,688 Cost: $750 |
$979 | 56,565 | $1,709 | 153 | - | - | - | - | - | - |
$979 56,565 kWh |
$1,709 153 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,197 Cost: $7,544 |
$1,112 | 64,185 | $1,942 | 174 | - | - | $(-20) | - | $163 | - |
$1,112 64,185 kWh |
$1,942 174 kW-months/year |
- - MMBtu |
$(-20) - $ |
$163 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $117 Cost: $40 |
$27 | 1,465 | $90 | 8 | - | - | - | - | - | - |
$27 1,465 kWh |
$90 8 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $(-61) Cost: $1,560 |
$102 | 5,862 | $90 | 8 | - | - | $(-463) | - | $210 | - |
$102 5,862 kWh |
$90 8 kW-months/year |
- - MMBtu |
$(-463) - $ |
$210 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,668 Cost: $500 |
$733 | 42,204 | $1,935 | 174 | - | - | - | - | - | - |
$733 42,204 kWh |
$1,935 174 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,580 Cost: $480 |
$1,580 | 91,149 | - | - | - | - | - | - | - | - |
$1,580 91,149 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,577 Cost: $1,200 |
- | - | - | - | $2,577 | 741 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,577 741 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $721 Cost: $1,334 |
- | - | - | - | - | - | $721 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$721 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $13,487 Cost: $13,408 |
$4,533 | 261,430 | $5,766 | 517 | $2,577 | 741 | $238 | - | $373 | - | $4,533 261,430 kWh |
$5,766 517 kW-months/year |
$2,577 741 MMBtu |
$238 - $ |
$373 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,942 Cost: $2,220 |
$2,340 | 134,818 | $2,025 | 182 | $2,577 | 741 | - | - | - | - | $2,340 134,818 kWh |
$2,025 182 kW-months/year |
$2,577 741 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |