IAC Assessment: ND0335
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1999
Principal Product Wood Moldings
NAICS n/a
SIC 2431 - Millwork
Sales $1,000,000-$5,000,000
# of Employees 56
Plant Area (Sq.Ft.) 85,000
Annual Production 2,100,000 Thousand Feet
Production Hrs. Annual 2,080
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $83,387 1,173,798 kWh $0.07
Electricity Demand $30,328 2,895 kW-months/year $10.48
TOTAL ENERGY COSTS $113,715
RECOMMENDED SAVINGS* $19,477 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,477
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$13,184
Cost:
$31,164
$5,296 76,202 $3,634 362 $4,254 - - - $5,296
76,202
kWh
$3,634
362
kW-months/year
$4,254
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,904
Cost:
$9,101
$1,825 31,360 $1,512 140 $1,567 - - - $1,825
31,360
kWh
$1,512
140
kW-months/year
$1,567
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$511
Cost:
$1,603
$281 4,396 $230 26 - - - - $281
4,396
kWh
$230
26
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$477
Cost:
$430
$297 3,810 $33 8 - - $147 - $297
3,810
kWh
$33
8
kW-months/year
-
-
$
$147
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$272
Cost:
$120
$272 3,224 - - - - - - $272
3,224
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$78
Cost:
$10
$78 1,758 - - - - - - $78
1,758
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$51
Cost:
$50
$51 879 - - - - - - $51
879
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$19,477
Cost:
$42,478
$8,100 121,629 $5,409 536 $5,821 - $147 - $8,100
121,629
kWh
$5,409
536
kW-months/year
$5,821
-
$
$147
-
$
TOTAL IMPLEMENTED Savings:
$19,477
Cost:
$42,478
$8,100 121,629 $5,409 536 $5,821 - $147 - $8,100
121,629
kWh
$5,409
536
kW-months/year
$5,821
-
$
$147
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost