IAC Assessment: ND0338
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0338
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1999
Principal Product Rubber Seals
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 225
Plant Area (Sq.Ft.) 60,000
Annual Production 750,000,000 Pounds
Production Hrs. Annual 6,864
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $346,833 9,646,835 kWh $0.04
Electricity Demand $182,185 16,856 kW-months/year $10.81
Natural Gas $54,546 9,434 MMBtu $5.78
TOTAL ENERGY COSTS $583,564
RECOMMENDED SAVINGS* $11,288 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $945
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$278
Cost:
$120
$278 16,120 - - - - - - $278
16,120
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$289
Cost:
$480
$69 4,103 $60 6 - - $160 - $69
4,103
kWh
$60
6
kW-months/year
-
-
MMBtu
$160
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,986
Cost:
$1,600
$1,058 61,254 $928 86 - - - - $1,058
61,254
kWh
$928
86
kW-months/year
-
-
MMBtu
-
-
$
04: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$318
Cost:
$272
$35 2,052 $19 2 $264 43 - - $35
2,052
kWh
$19
2
kW-months/year
$264
43
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$506
Cost:
$800
$354 20,516 $152 14 - - - - $354
20,516
kWh
$152
14
kW-months/year
-
-
MMBtu
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$60
Cost:
$87
$60 2,052 - - - - - - $60
2,052
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.2514 COVER OPEN TANKS Savings:
$292
Cost:
$400
$139 8,206 $153 14 - - - - $139
8,206
kWh
$153
14
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$7,559
Cost:
$18,073
$3,610 208,968 $3,949 365 - - - - $3,610
208,968
kWh
$3,949
365
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$11,288
Cost:
$21,832
$5,603 323,271 $5,261 487 $264 43 $160 - $5,603
323,271
kWh
$5,261
487
kW-months/year
$264
43
MMBtu
$160
-
$
TOTAL IMPLEMENTED Savings:
$945
Cost:
$959
$442 24,327 $79 8 $264 43 $160 - $442
24,327
kWh
$79
8
kW-months/year
$264
43
MMBtu
$160
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost