IAC logo
IAC Assessment: ND0341
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0341
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1999
Principal Product Steel Wire
NAICS n/a
SIC 3315 - Steel Wire And Related Products
Sales $5,000,000-$10,000,000
# of Employees 65
Plant Area (Sq.Ft.) 200,000
Annual Production 14,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $83,167 7,643,904 kWh $0.01
Electricity Demand $308,039 19,453 kW-months/year $15.84
TOTAL ENERGY COSTS $391,206
RECOMMENDED SAVINGS* $127,474 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,063
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ Tgal $ $ $ $ $ $ $ Tgal
01: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$22,377
Cost:
$60,343
$5,972 538,687 $16,405 1,036 - - - - - - - - - - $5,972
538,687
kWh
$16,405
1,036
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
Tgal
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$128
Cost:
$200
$40 3,517 $88 6 - - - - - - - - - - $40
3,517
kWh
$88
6
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
Tgal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$344
Cost:
$180
$344 31,067 - - - - - - - - - - - - $344
31,067
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3
Cost:
$300
$22 2,052 $44 3 - - $(-116) - - - $53 - - - $22
2,052
kWh
$44
3
kW-months/year
-
-
Tgal
$(-116)
-
$
-
-
$
$53
-
$
-
-
Tgal
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$4,719
Cost:
$250
- - - - - - - - $4,719 - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
$4,719
-
$
-
-
$
-
-
Tgal
06: 4.425 ELIMINATE/REDUCE REDUNDANT INSPECTIONS Savings:
$(-177)
Cost:
$336
- - - - - - - - $(-177) - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
$(-177)
-
$
-
-
$
-
-
Tgal
07: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$9,218
Cost:
$250
- - - - $9,218 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$9,218
-
Tgal
-
-
$
-
-
$
-
-
$
-
-
Tgal
08: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$90,862
Cost:
$120,000
$(-344) (-31,067) $(-946) (-60) - - - - - - - - $92,152 - $(-344)
(-31,067)
kWh
$(-946)
(-60)
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
$
$92,152
-
Tgal
TOTAL RECOMMENDED Savings:
$127,474
Cost:
$181,859
$6,034 544,256 $15,591 985 $9,218 - $(-116) - $4,542 - $53 - $92,152 - $6,034
544,256
kWh
$15,591
985
kW-months/year
$9,218
-
Tgal
$(-116)
-
$
$4,542
-
$
$53
-
$
$92,152
-
Tgal
TOTAL IMPLEMENTED Savings:
$5,063
Cost:
$430
$344 31,067 - - - - - - $4,719 - - - - - $344
31,067
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
$4,719
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Water Disposal Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption