IAC logo
IAC Assessment: ND0342
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0342
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 2000
Principal Product Lumber Processing
NAICS n/a
SIC 2491 - Wood Preserving
Sales $50,000,000-$100,000,000
# of Employees 140
Plant Area (Sq.Ft.) 200,000
Annual Production 120,000 Thousand Feet
Production Hrs. Annual 5,610
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $119,065 2,313,599 kWh $0.05
Electricity Demand $39,219 9,341 kW-months/year $4.20
Electricity Fees $1,365 - $ -
Natural Gas $33,572 7,317 MMBtu $4.59
TOTAL ENERGY COSTS $193,221
RECOMMENDED SAVINGS* $13,534 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $
01: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$4,286
Cost:
$13,061
$2,858 59,496 $746 95 - - - - - - - - $682 - $2,858
59,496
kWh
$746
95
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
$682
-
$
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$5,684
Cost:
$10,854
- - - - - - $5,684 1,249 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,684
1,249
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,135
Cost:
$4,118
$956 19,930 $179 43 - - - - - - - - - - $956
19,930
kWh
$179
43
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$534
Cost:
$500
$510 10,551 $24 6 - - - - - - - - - - $510
10,551
kWh
$24
6
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$444
Cost:
$20
$397 8,206 $47 11 - - - - - - - - - - $397
8,206
kWh
$47
11
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$297
Cost:
$450
$262 5,569 $141 34 - - $(-106) (-23) - - - - - - $262
5,569
kWh
$141
34
kW-months/year
-
-
$
$(-106)
(-23)
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$85
Cost:
$25
$85 1,758 - - - - - - - - - - - - $85
1,758
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$617
Cost:
$800
$151 3,224 $18 4 - - - - $308 - $140 - - - $151
3,224
kWh
$18
4
kW-months/year
-
-
$
-
-
MMBtu
$308
-
$
$140
-
$
-
-
$
09: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$221
Cost:
$468
- - - - - - - - $221 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$221
-
$
-
-
$
-
-
$
10: 4.811 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS Savings:
$121
Cost:
$250
- - - - $121 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$121
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
11: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$110
Cost:
-
- - - - $110 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$110
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$13,534
Cost:
$30,546
$5,219 108,734 $1,155 193 $231 - $5,578 1,226 $529 - $140 - $682 - $5,219
108,734
kWh
$1,155
193
kW-months/year
$231
-
$
$5,578
1,226
MMBtu
$529
-
$
$140
-
$
$682
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost