IAC logo
IAC Assessment: ND0354
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0354
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 2000
Principal Product Brass Plumbing Fixtures
NAICS n/a
SIC 3432 - Plumbing Fixture Fittings And Trim
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 164,644
Annual Production 7,000,000 Pounds
Production Hrs. Annual 4,463
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $233,994 14,242,673 kWh $0.02
Electricity Demand $446,750 39,396 kW-months/year $11.34
Natural Gas $164,986 40,326 MMBtu $4.09
TOTAL ENERGY COSTS $909,403
RECOMMENDED SAVINGS* $19,816 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,671
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$355
Cost:
$240
$355 21,688 - - - - - - - - - - - - $355
21,688
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$415
Cost:
$660
$61 3,810 $59 5 - - - - - - $175 - $120 - $61
3,810
kWh
$59
5
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$175
-
$
$120
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,533
Cost:
$14,644
$720 43,669 $1,813 158 - - - - - - - - - - $720
43,669
kWh
$1,813
158
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,145
Cost:
$2,970
$319 19,343 $2,164 189 - - $(-338) (-83) - - - - - - $319
19,343
kWh
$2,164
189
kW-months/year
-
-
$
$(-338)
(-83)
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,506
Cost:
$300
$778 47,186 $728 64 - - - - - - - - - - $778
47,186
kWh
$728
64
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$8,446
Cost:
$27,572
$1,741 105,803 $6,705 586 - - - - - - - - - - $1,741
105,803
kWh
$6,705
586
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 3.4151 MINIMIZE WATER USAGE Savings:
$2,685
Cost:
$6,840
- - - - - - - - $2,685 137,700 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,685
137,700
Tgal
-
-
$
-
-
$
08: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,731
Cost:
-
- - - - $1,731 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,731
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$19,816
Cost:
$53,226
$3,974 241,499 $11,469 1,002 $1,731 - $(-338) (-83) $2,685 137,700 $175 - $120 - $3,974
241,499
kWh
$11,469
1,002
kW-months/year
$1,731
-
$
$(-338)
(-83)
MMBtu
$2,685
137,700
Tgal
$175
-
$
$120
-
$
TOTAL IMPLEMENTED Savings:
$17,671
Cost:
$50,256
$3,655 222,156 $9,305 813 $1,731 - - - $2,685 137,700 $175 - $120 - $3,655
222,156
kWh
$9,305
813
kW-months/year
$1,731
-
$
-
-
MMBtu
$2,685
137,700
Tgal
$175
-
$
$120
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Ancillary Material Cost