Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Notre Dame Univ. |
---|---|
Assessment Year | 2000 |
Principal Product | Aluminum Entrance Systems |
NAICS | n/a |
SIC | 3442 - Metal Doors, Sash, And Trim |
Sales | $10,000,000-$50,000,000 |
# of Employees | 139 |
Plant Area (Sq.Ft.) | 78,500 |
Annual Production | 19,122 Pieces |
Production Hrs. Annual | 4,680 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $105,504 | 1,899,472 | kWh | $0.06 |
Electricity Demand | $23,842 | 6,036 | kW-months/year | $3.95 |
Natural Gas | $34,914 | 9,130 | MMBtu | $3.82 |
TOTAL ENERGY COSTS | $164,260 | |||
RECOMMENDED SAVINGS* | $19,802 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,495 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,224 Cost: $853 |
$3,648 | 63,306 | $576 | 146 | - | - | - | - | - | - |
$3,648 63,306 kWh |
$576 146 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $885 Cost: $220 |
$885 | 15,240 | - | - | - | - | - | - | - | - |
$885 15,240 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $419 Cost: $400 |
$306 | 5,275 | $199 | 50 | $(-86) | (-23) | - | - | - | - |
$306 5,275 kWh |
$199 50 kW-months/year |
$(-86) (-23) MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $309 Cost: $40 |
$266 | 4,689 | $43 | 11 | - | - | - | - | - | - |
$266 4,689 kWh |
$43 11 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $584 Cost: $2,012 |
$484 | 8,499 | $100 | 25 | - | - | - | - | - | - |
$484 8,499 kWh |
$100 25 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $353 Cost: $300 |
$294 | 4,982 | $59 | 15 | - | - | - | - | - | - |
$294 4,982 kWh |
$59 15 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $11,843 Cost: $8,685 |
$8,340 | 144,490 | $1,463 | 370 | - | - | $761 | - | $1,279 | - |
$8,340 144,490 kWh |
$1,463 370 kW-months/year |
- - MMBtu |
$761 - $ |
$1,279 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $527 Cost: $600 |
$448 | 7,913 | $79 | 20 | - | - | - | - | - | - |
$448 7,913 kWh |
$79 20 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $658 Cost: $200 |
$560 | 9,672 | $98 | 25 | - | - | - | - | - | - |
$560 9,672 kWh |
$98 25 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $19,802 Cost: $13,310 |
$15,231 | 264,066 | $2,617 | 662 | $(-86) | (-23) | $761 | - | $1,279 | - | $15,231 264,066 kWh |
$2,617 662 kW-months/year |
$(-86) (-23) MMBtu |
$761 - $ |
$1,279 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,495 Cost: $1,713 |
$5,665 | 98,182 | $916 | 232 | $(-86) | (-23) | - | - | - | - | $5,665 98,182 kWh |
$916 232 kW-months/year |
$(-86) (-23) MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |