Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Notre Dame Univ. |
---|---|
Assessment Year | 2000 |
Principal Product | Aluminum Die Casts |
NAICS | n/a |
SIC | 3365 - Aluminum Foundries |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 116,000 |
Annual Production | 10,000,000 Pounds |
Production Hrs. Annual | 6,240 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $159,059 | 10,425,557 | kWh | $0.02 |
Electricity Demand | $253,839 | 20,996 | kW-months/year | $12.09 |
Natural Gas | $222,715 | 63,195 | MMBtu | $3.52 |
LPG | $15,100 | 940 | MMBtu | $16.06 |
TOTAL ENERGY COSTS | $650,713 | |||
RECOMMENDED SAVINGS* | $18,601 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | LPG | Electricity Usage | Electricity Demand | Natural Gas | LPG | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $1,922 Cost: $8,000 |
$(-85) | (-5,569) | $(-133) | (-11) | $2,140 | 608 | - | - |
$(-85) (-5,569) kWh |
$(-133) (-11) kW-months/year |
$2,140 608 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL |
Savings: $11,307 Cost: $39,100 |
$(-182) | (-12,016) | $(-276) | (-23) | $(-3,335) | (-946) | $15,100 | 940 |
$(-182) (-12,016) kWh |
$(-276) (-23) kW-months/year |
$(-3,335) (-946) MMBtu |
$15,100 940 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $164 Cost: $400 |
$139 | 9,086 | $163 | 14 | $(-138) | (-39) | - | - |
$139 9,086 kWh |
$163 14 kW-months/year |
$(-138) (-39) MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $67 Cost: $30 |
$67 | 4,689 | - | - | - | - | - | - |
$67 4,689 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,996 Cost: $300 |
$842 | 55,100 | $1,154 | 96 | - | - | - | - |
$842 55,100 kWh |
$1,154 96 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,588 Cost: $555 |
$1,588 | 104,045 | - | - | - | - | - | - |
$1,588 104,045 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $1,479 Cost: $280 |
$586 | 38,394 | $893 | 74 | - | - | - | - |
$586 38,394 kWh |
$893 74 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $78 Cost: $200 |
$31 | 2,052 | $47 | 4 | - | - | - | - |
$31 2,052 kWh |
$47 4 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $18,601 Cost: $48,865 |
$2,986 | 195,781 | $1,848 | 154 | $(-1,333) | (-377) | $15,100 | 940 | $2,986 195,781 kWh |
$1,848 154 kW-months/year |
$(-1,333) (-377) MMBtu |
$15,100 940 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | LPG | Electricity Usage | Electricity Demand | Natural Gas | LPG |