IAC Assessment: ND0359
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0359
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 2000
Principal Product Engine & Transmission Parts
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $5,000,000-$10,000,000
# of Employees 85
Plant Area (Sq.Ft.) 50,000
Annual Production 60,000 Pieces
Production Hrs. Annual 2,288
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $78,824 2,527,843 kWh $0.03
Electricity Demand $53,368 4,963 kW-months/year $10.75
Electricity Fees $6,696 - $ -
Natural Gas $8,884 1,646 MMBtu $5.40
TOTAL ENERGY COSTS $147,772
RECOMMENDED SAVINGS* $22,626 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,530
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$858
Cost:
$195
$858 29,015 - - - - - - $858
29,015
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$4,437
Cost:
$17,206
$2,971 78,546 $1,466 175 - - - - $2,971
78,546
kWh
$1,466
175
kW-months/year
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$207
Cost:
$280
$96 2,052 $31 3 - - $80 - $96
2,052
kWh
$31
3
kW-months/year
-
-
$
$80
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,477
Cost:
$8,551
$536 18,171 $941 84 - - - - $536
18,171
kWh
$941
84
kW-months/year
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$721
Cost:
$800
$600 13,482 $121 26 - - - - $600
13,482
kWh
$121
26
kW-months/year
-
-
$
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$879
Cost:
$614
- - - - $879 - - - -
-
kWh
-
-
kW-months/year
$879
-
$
-
-
$
07: 2.8112 COMBINE UTILITY METERS Savings:
$8,059
Cost:
$40,000
- - - - $8,059 - - - -
-
kWh
-
-
kW-months/year
$8,059
-
$
-
-
$
08: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$408
Cost:
-
- - - - $408 - - - -
-
kWh
-
-
kW-months/year
$408
-
$
-
-
$
09: 4.8110 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS Savings:
$5,580
Cost:
$250
- - - - $5,580 - - - -
-
kWh
-
-
kW-months/year
$5,580
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$22,626
Cost:
$67,896
$5,061 141,266 $2,559 288 $14,926 - $80 - $5,061
141,266
kWh
$2,559
288
kW-months/year
$14,926
-
$
$80
-
$
TOTAL IMPLEMENTED Savings:
$8,530
Cost:
$9,276
$1,490 49,238 $972 87 $5,988 - $80 - $1,490
49,238
kWh
$972
87
kW-months/year
$5,988
-
$
$80
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost