IAC logo
IAC Assessment: ND0361
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0361
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 2000
Principal Product Extruded Metal
NAICS n/a
SIC 3354 - Aluminum Extruded Products
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 83,000
Annual Production 0 Pounds
Production Hrs. Annual 7,344
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $193,425 5,702,521 kWh $0.03
Electricity Demand $84,624 11,405 kW-months/year $7.42
Electricity Fees $3,411 - $ -
Natural Gas $134,066 31,583 MMBtu $4.24
TOTAL ENERGY COSTS $415,526
RECOMMENDED SAVINGS* $11,941 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,136
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$695
Cost:
$100
$695 20,516 - - - - - - - - - - $695
20,516
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,270
Cost:
$6,930
$555 16,413 $715 96 - - - - - - - - $555
16,413
kWh
$715
96
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$606
Cost:
$750
$125 3,810 $38 5 - - - - $219 - $224 - $125
3,810
kWh
$38
5
kW-months/year
-
-
MMBtu
-
-
MMBtu
$219
-
$
$224
-
$
04: 2.8226 INCREASE EFFICIENCY OF TRUCKS Savings:
$2,929
Cost:
$18,500
$(-404) (-12,016) $(-170) (-23) $(-1,619) (-347) $5,122 379 - - - - $(-404)
(-12,016)
kWh
$(-170)
(-23)
kW-months/year
$(-1,619)
(-347)
MMBtu
$5,122
379
MMBtu
-
-
$
-
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$4,112
Cost:
$41,893
$3,029 89,390 $1,083 146 - - - - - - - - $3,029
89,390
kWh
$1,083
146
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,329
Cost:
$400
$1,792 52,755 $537 72 - - - - - - - - $1,792
52,755
kWh
$537
72
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$11,941
Cost:
$68,573
$5,792 170,868 $2,203 296 $(-1,619) (-347) $5,122 379 $219 - $224 - $5,792
170,868
kWh
$2,203
296
kW-months/year
$(-1,619)
(-347)
MMBtu
$5,122
379
MMBtu
$219
-
$
$224
-
$
TOTAL IMPLEMENTED Savings:
$7,136
Cost:
$42,393
$5,516 162,661 $1,620 218 - - - - - - - - $5,516
162,661
kWh
$1,620
218
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Ancillary Material Cost