IAC logo
IAC Assessment: ND0362
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0362
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 2000
Principal Product injection manifolds and liquid reservoirs
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 120,000
Annual Production 0 Units
Production Hrs. Annual 8,568
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $259,150 7,229,191 kWh $0.04
Electricity Demand $130,843 13,830 kW-months/year $9.46
TOTAL ENERGY COSTS $407,710
RECOMMENDED SAVINGS* $21,613 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,985
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$17,460
Cost:
$200
$6,758 188,453 $12,487 1,320 - - $(-1,785) - - - $6,758
188,453
kWh
$12,487
1,320
kW-months/year
-
-
Tgal
$(-1,785)
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$76
Cost:
$150
$27 879 $9 1 - - - - $40 - $27
879
kWh
$9
1
kW-months/year
-
-
Tgal
-
-
$
$40
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$460
Cost:
$200
$336 9,379 $124 13 - - - - - - $336
9,379
kWh
$124
13
kW-months/year
-
-
Tgal
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,647
Cost:
$1,000
$1,390 38,687 $257 27 - - - - - - $1,390
38,687
kWh
$257
27
kW-months/year
-
-
Tgal
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$491
Cost:
$40
$491 13,775 - - - - - - - - $491
13,775
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
06: 3.4151 MINIMIZE WATER USAGE Savings:
$445
Cost:
$1,330
- - - - $445 128,800 - - - - -
-
kWh
-
-
kW-months/year
$445
128,800
Tgal
-
-
$
-
-
$
07: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$1,034
Cost:
-
- - - - - - $1,034 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$1,034
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$21,613
Cost:
$2,920
$9,002 251,173 $12,877 1,361 $445 128,800 $(-751) - $40 - $9,002
251,173
kWh
$12,877
1,361
kW-months/year
$445
128,800
Tgal
$(-751)
-
$
$40
-
$
TOTAL IMPLEMENTED Savings:
$18,985
Cost:
$240
$7,249 202,228 $12,487 1,320 - - $(-751) - - - $7,249
202,228
kWh
$12,487
1,320
kW-months/year
-
-
Tgal
$(-751)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost