IAC Assessment: ND0364
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 2000
Principal Product metal stampings
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 370
Plant Area (Sq.Ft.) 148,000
Annual Production 36,500,000 Pieces
Production Hrs. Annual 7,878
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $167,090 7,369,285 kWh $0.02
Electricity Demand $142,432 14,170 kW-months/year $10.05
Natural Gas $92,106 23,982 MMBtu $3.84
TOTAL ENERGY COSTS $401,628
RECOMMENDED SAVINGS* $17,378 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,892
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal
01: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$8,340
Cost:
$22,377
$4,981 230,070 $3,359 334 - - - - - - - - $4,981
230,070
kWh
$3,359
334
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,206
Cost:
-
$1,808 79,719 $1,220 121 - - - - $178 - - - $1,808
79,719
kWh
$1,220
121
kW-months/year
-
-
MMBtu
-
-
$
$178
-
$
-
-
Tgal
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$839
Cost:
$600
$494 21,688 $345 34 - - - - - - - - $494
21,688
kWh
$345
34
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$271
Cost:
$575
$52 2,052 $31 3 - - $123 - $65 - - - $52
2,052
kWh
$31
3
kW-months/year
-
-
MMBtu
$123
-
$
$65
-
$
-
-
Tgal
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,221
Cost:
$1,000
$1,924 84,701 $1,297 129 - - - - - - - - $1,924
84,701
kWh
$1,297
129
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$75
Cost:
$200
$75 3,224 - - - - - - - - - - $75
3,224
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$605
Cost:
$400
$198 8,792 $543 54 $(-136) (-35) - - - - - - $198
8,792
kWh
$543
54
kW-months/year
$(-136)
(-35)
MMBtu
-
-
$
-
-
$
-
-
Tgal
08: 3.4151 MINIMIZE WATER USAGE Savings:
$821
Cost:
$2,875
- - - - - - $250 - $(-227) - $798 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$250
-
$
$(-227)
-
$
$798
-
Tgal
TOTAL RECOMMENDED Savings:
$17,378
Cost:
$28,027
$9,532 430,246 $6,795 675 $(-136) (-35) $373 - $16 - $798 - $9,532
430,246
kWh
$6,795
675
kW-months/year
$(-136)
(-35)
MMBtu
$373
-
$
$16
-
$
$798
-
Tgal
TOTAL IMPLEMENTED Savings:
$11,892
Cost:
$23,152
$6,916 315,065 $4,610 458 - - $123 - $243 - - - $6,916
315,065
kWh
$4,610
458
kW-months/year
-
-
MMBtu
$123
-
$
$243
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption