IAC logo
IAC Assessment: NL0005
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0005
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2017
Principal Product treated municipal and industrial wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 10
Plant Area (Sq.Ft.) 34,170
Annual Production 1,992,900 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $150,981 5,591,896 kWh $0.03
Electricity Demand $68,484 11,890 kW-months/year $5.76
Electricity Fees $3,145 - $ -
LPG $13,950 15,000 MMBtu $0.93
TOTAL ENERGY COSTS $236,560
RECOMMENDED SAVINGS* $147,150 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $800
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Raw Material Increase in Production Electricity Usage Electricity Demand Primary Raw Material Increase in Production
$ kWh $ kW-months/year $ $ $ %
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$106,860
Cost:
$650,000
$7,891 289,056 $6,083 1,056 $16,236 - $76,650 - $7,891
289,056
kWh
$6,083
1,056
kW-months/year
$16,236
-
$
$76,650
-
%
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$35,435
Cost:
$57,984
$26,020 953,109 $9,415 1,326 - - - - $26,020
953,109
kWh
$9,415
1,326
kW-months/year
-
-
$
-
-
%
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,055
Cost:
$60,000
$3,024 110,769 $1,031 179 - - - - $3,024
110,769
kWh
$1,031
179
kW-months/year
-
-
$
-
-
%
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$800
Cost:
$6,424
$800 29,292 - - - - - - $800
29,292
kWh
-
-
kW-months/year
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$147,150
Cost:
$774,408
$37,735 1,382,226 $16,529 2,561 $16,236 - $76,650 - $37,735
1,382,226
kWh
$16,529
2,561
kW-months/year
$16,236
-
$
$76,650
-
%
TOTAL IMPLEMENTED Savings:
$800
Cost:
$6,424
$800 29,292 - - - - - - $800
29,292
kWh
-
-
kW-months/year
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ %
Electricity Usage Electricity Demand Primary Raw Material Increase in Production Electricity Usage Electricity Demand Primary Raw Material Increase in Production