Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nebraska–Lincoln |
---|---|
Assessment Year | 2017 |
Principal Product | Pork Products |
NAICS | 311612 - Meat Processed from Carcasses |
SIC | 2013 - Sausages And Other Prepared Meats |
Sales | $100,000,000-$500,000,000 |
# of Employees | 475 |
Plant Area (Sq.Ft.) | 300,000 |
Annual Production | 365,000,000 Units |
Production Hrs. Annual | 3,600 |
Location (State) | NE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $588,274 | 22,988,750 | kWh | $0.03 |
Electricity Demand | $888,155 | 43,938 | kW-months/year | $20.21 |
Electricity Fees | $63,264 | - | $ | - |
Natural Gas | $696,000 | 161,000 | MMBtu | $4.32 |
TOTAL ENERGY COSTS | $2,235,693 | |||
RECOMMENDED SAVINGS* | $175,950 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $105,750 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $62,200 Cost: $77,400 |
- | - | - | - | $62,200 | 14,400 | - | - | - | - |
- - kWh |
- - kW-months/year |
$62,200 14,400 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $47,300 Cost: $5,400 |
$49,000 | 1,930,000 | - | - | - | - | - | - | $(-1,700) | - |
$49,000 1,930,000 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$(-1,700) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE |
Savings: $36,200 Cost: $1,700 |
- | - | - | - | $26,200 | 6,070 | $10,000 | 5,832 | - | - |
- - kWh |
- - kW-months/year |
$26,200 6,070 MMBtu |
$10,000 5,832 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $16,300 Cost: $67,600 |
$7,448 | 291,700 | $8,852 | 438 | - | - | - | - | - | - |
$7,448 291,700 kWh |
$8,852 438 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $8,000 Cost: $3,100 |
$3,294 | 126,600 | $4,706 | 233 | - | - | - | - | - | - |
$3,294 126,600 kWh |
$4,706 233 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,250 Cost: $12,000 |
$3,250 | 127,000 | - | - | - | - | - | - | - | - |
$3,250 127,000 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,700 Cost: $840 |
- | - | - | - | $2,700 | 620 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,700 620 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $175,950 Cost: $168,040 |
$62,992 | 2,475,300 | $13,558 | 671 | $91,100 | 21,090 | $10,000 | 5,832 | $(-1,700) | - | $62,992 2,475,300 kWh |
$13,558 671 kW-months/year |
$91,100 21,090 MMBtu |
$10,000 5,832 Tgal |
$(-1,700) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $105,750 Cost: $87,540 |
$59,698 | 2,348,700 | $8,852 | 438 | $28,900 | 6,690 | $10,000 | 5,832 | $(-1,700) | - | $59,698 2,348,700 kWh |
$8,852 438 kW-months/year |
$28,900 6,690 MMBtu |
$10,000 5,832 Tgal |
$(-1,700) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Administrative Changes |