IAC logo
IAC Assessment: NL0024
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0024
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2018
Principal Product Semi-Trailers
NAICS 336212 - Truck Trailer Manufacturing
SIC 3715 - Truck Trailers
Sales $10,000,000-$50,000,000
# of Employees 83
Plant Area (Sq.Ft.) 68,770
Annual Production 500 Units
Production Hrs. Annual 2,500
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $61,111 754,457 kWh $0.08
Electricity Demand $71,463 3,408 kW-months/year $20.97
Natural Gas $30,426 6,508 MMBtu $4.68
TOTAL ENERGY COSTS $170,430
RECOMMENDED SAVINGS* $30,371 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,239
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Increase in Production Electricity Usage Electricity Demand Water Disposal Personnel Changes Increase in Production
$ kWh $ kW-months/year $ Tgal $ $ $ %
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,239
Cost:
$33,526
$10,726 132,418 $13,048 622 - - $465 - - - $10,726
132,418
kWh
$13,048
622
kW-months/year
-
-
Tgal
$465
-
$
-
-
%
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$5,242
Cost:
$10,000
$(-158) (-1,956) - - - - - - $5,400 - $(-158)
(-1,956)
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
$5,400
-
%
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$571
Cost:
-
$571 7,050 - - - - - - - - $571
7,050
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
%
04: 3.4155 METER WASTE WATER Savings:
$319
Cost:
-
- - - - $319 100 - - - - -
-
kWh
-
-
kW-months/year
$319
100
Tgal
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$30,371
Cost:
$43,526
$11,139 137,512 $13,048 622 $319 100 $465 - $5,400 - $11,139
137,512
kWh
$13,048
622
kW-months/year
$319
100
Tgal
$465
-
$
$5,400
-
%
TOTAL IMPLEMENTED Savings:
$24,239
Cost:
$33,526
$10,726 132,418 $13,048 622 - - $465 - - - $10,726
132,418
kWh
$13,048
622
kW-months/year
-
-
Tgal
$465
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ %
Electricity Usage Electricity Demand Water Disposal Personnel Changes Increase in Production Electricity Usage Electricity Demand Water Disposal Personnel Changes Increase in Production