Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nebraska–Lincoln |
---|---|
Assessment Year | 2018 |
Principal Product | Semi-Trailers |
NAICS | 336212 - Truck Trailer Manufacturing |
SIC | 3715 - Truck Trailers |
Sales | $10,000,000-$50,000,000 |
# of Employees | 83 |
Plant Area (Sq.Ft.) | 68,770 |
Annual Production | 500 Units |
Production Hrs. Annual | 2,500 |
Location (State) | NE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $61,111 | 754,457 | kWh | $0.08 |
Electricity Demand | $71,463 | 3,408 | kW-months/year | $20.97 |
Natural Gas | $30,426 | 6,508 | MMBtu | $4.68 |
TOTAL ENERGY COSTS | $170,430 | |||
RECOMMENDED SAVINGS* | $30,371 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $24,239 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Increase in Production | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $24,239 Cost: $33,526 |
$10,726 | 132,418 | $13,048 | 622 | - | - | $465 | - | - | - |
$10,726 132,418 kWh |
$13,048 622 kW-months/year |
- - Tgal |
$465 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $5,242 Cost: $10,000 |
$(-158) | (-1,956) | - | - | - | - | - | - | $5,400 | - |
$(-158) (-1,956) kWh |
- - kW-months/year |
- - Tgal |
- - $ |
$5,400 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $571 Cost: - |
$571 | 7,050 | - | - | - | - | - | - | - | - |
$571 7,050 kWh |
- - kW-months/year |
- - Tgal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4155 METER WASTE WATER |
Savings: $319 Cost: - |
- | - | - | - | $319 | 100 | - | - | - | - |
- - kWh |
- - kW-months/year |
$319 100 Tgal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $30,371 Cost: $43,526 |
$11,139 | 137,512 | $13,048 | 622 | $319 | 100 | $465 | - | $5,400 | - | $11,139 137,512 kWh |
$13,048 622 kW-months/year |
$319 100 Tgal |
$465 - $ |
$5,400 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $24,239 Cost: $33,526 |
$10,726 | 132,418 | $13,048 | 622 | - | - | $465 | - | - | - | $10,726 132,418 kWh |
$13,048 622 kW-months/year |
- - Tgal |
$465 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Increase in Production | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Increase in Production |