IAC logo
IAC Assessment: NL0025
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0025
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2018
Principal Product Hydraulic Coupling Components
NAICS 332710 - Machine Shops
SIC 3451 - Screw Machine Products
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 53,750
Annual Production 14,000,000 Pieces
Production Hrs. Annual 4,160
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $199,347 2,556,140 kWh $0.08
Electricity Demand $161,135 9,502 kW-months/year $16.96
Electricity Fees $11,278 - $ -
Natural Gas $44,097 4,319 MMBtu $10.21
TOTAL ENERGY COSTS $421,078
RECOMMENDED SAVINGS* $15,147 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,953
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Increase in Production Electricity Usage Electricity Demand Personnel Changes Increase in Production
$ kWh $ kW-months/year $ $ $ %
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$7,194
Cost:
$15,000
$(-183) (-3,102) $(-123) (-7) - - $7,500 - $(-183)
(-3,102)
kWh
$(-123)
(-7)
kW-months/year
-
-
$
$7,500
-
%
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,388
Cost:
$45,275
$1,767 29,952 $1,466 86 $1,155 - - - $1,767
29,952
kWh
$1,466
86
kW-months/year
$1,155
-
$
-
-
%
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,651
Cost:
$1,575
$2,651 44,935 - - - - - - $2,651
44,935
kWh
-
-
kW-months/year
-
-
$
-
-
%
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$914
Cost:
$1,600
$1,064 18,026 - - $(-150) - - - $1,064
18,026
kWh
-
-
kW-months/year
$(-150)
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$15,147
Cost:
$63,450
$5,299 89,811 $1,343 79 $1,005 - $7,500 - $5,299
89,811
kWh
$1,343
79
kW-months/year
$1,005
-
$
$7,500
-
%
TOTAL IMPLEMENTED Savings:
$7,953
Cost:
$48,450
$5,482 92,913 $1,466 86 $1,005 - - - $5,482
92,913
kWh
$1,466
86
kW-months/year
$1,005
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ %
Electricity Usage Electricity Demand Personnel Changes Increase in Production Electricity Usage Electricity Demand Personnel Changes Increase in Production