IAC logo
IAC Assessment: NL0026
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0026
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2018
Principal Product Printed Paperboard Packaging
NAICS 322212 - Folding Paperboard Box Manufacturing
SIC 2657 - Folding Paperboard Boxes
Sales $10,000,000-$50,000,000
# of Employees 162
Plant Area (Sq.Ft.) 230,000
Annual Production 150,000,000 Units
Production Hrs. Annual 4,480
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $101,564 3,766,961 kWh $0.03
Electricity Demand $200,185 13,876 kW-months/year $14.43
Electricity Fees $49,903 - $ -
Natural Gas $43,167 6,206 MMBtu $6.96
TOTAL ENERGY COSTS $394,818
RECOMMENDED SAVINGS* $48,710 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,020
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Increase in Production Electricity Usage Electricity Demand Personnel Changes Increase in Production
$ kWh $ kW-months/year $ $ $ %
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$28,240
Cost:
$65,000
$520 19,200 $720 50 - - $27,000 - $520
19,200
kWh
$720
50
kW-months/year
-
-
$
$27,000
-
%
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$19,570
Cost:
$69,390
$8,055 297,600 $11,515 798 - - - - $8,055
297,600
kWh
$11,515
798
kW-months/year
-
-
$
-
-
%
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$450
Cost:
$1,000
$795 29,440 - - $(-345) - - - $795
29,440
kWh
-
-
kW-months/year
$(-345)
-
$
-
-
%
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$450
Cost:
-
$450 16,710 - - - - - - $450
16,710
kWh
-
-
kW-months/year
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$48,710
Cost:
$135,390
$9,820 362,950 $12,235 848 $(-345) - $27,000 - $9,820
362,950
kWh
$12,235
848
kW-months/year
$(-345)
-
$
$27,000
-
%
TOTAL IMPLEMENTED Savings:
$20,020
Cost:
$70,390
$8,850 327,040 $11,515 798 $(-345) - - - $8,850
327,040
kWh
$11,515
798
kW-months/year
$(-345)
-
$
-
-
%
Savings