IAC logo
IAC Assessment: NL0027
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0027
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2018
Principal Product Compressed Natural Gas Tanks for Large Vehicle Use
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 130
Plant Area (Sq.Ft.) 108,000
Annual Production 30,000 Units
Production Hrs. Annual 7,200
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $151,368 5,792,800 kWh $0.03
Electricity Demand $206,851 10,825 kW-months/year $19.11
Electricity Fees $86,616 - $ -
Natural Gas $90,719 13,663 MMBtu $6.64
TOTAL ENERGY COSTS $581,970
RECOMMENDED SAVINGS* $49,070 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,963
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes
$ kWh $ kW-months/year $ Tgal $ Tgal $ $
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$24,797
Cost:
$32,620
$(-1,123) (-43,200) - - $12,960 4,320 $12,960 4,320 - - $(-1,123)
(-43,200)
kWh
-
-
kW-months/year
$12,960
4,320
Tgal
$12,960
4,320
Tgal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,840
Cost:
$74,980
$11,091 426,585 $10,709 560 - - - - $(-2,960) - $11,091
426,585
kWh
$10,709
560
kW-months/year
-
-
Tgal
-
-
Tgal
$(-2,960)
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,500
Cost:
$2,500
$2,264 87,000 $2,236 117 - - - - - - $2,264
87,000
kWh
$2,236
117
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$607
Cost:
$1,050
$607 23,339 - - - - - - - - $607
23,339
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$326
Cost:
$1,000
$452 17,636 - - - - - - $(-126) - $452
17,636
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
$(-126)
-
$
TOTAL RECOMMENDED Savings:
$49,070
Cost:
$112,150
$13,291 511,360 $12,945 677 $12,960 4,320 $12,960 4,320 $(-3,086) - $13,291
511,360
kWh
$12,945
677
kW-months/year
$12,960
4,320
Tgal
$12,960
4,320
Tgal
$(-3,086)
-
$
TOTAL IMPLEMENTED Savings:
$43,963
Cost:
$108,600
$10,420 401,021 $10,709 560 $12,960 4,320 $12,960 4,320 $(-3,086) - $10,420
401,021
kWh
$10,709
560
kW-months/year
$12,960
4,320
Tgal
$12,960
4,320
Tgal
$(-3,086)
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ Tgal $ $
Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes