Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nebraska–Lincoln |
---|---|
Assessment Year | 2019 |
Principal Product | Custom Molded Rubber Products |
NAICS | 326299 - All Other Rubber Product Manufacturing |
SIC | 3061 - Mechanical Rubber Goods |
Sales | $10,000,000-$50,000,000 |
# of Employees | 66 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 2,500,000 Pounds |
Production Hrs. Annual | 6,072 |
Location (State) | NE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $133,125 | 1,955,844 | kWh | $0.07 |
Electricity Demand | $30,326 | 3,702 | kW-months/year | $8.19 |
Electricity Fees | $5,316 | - | $ | - |
Natural Gas | $9,786 | 1,852 | MMBtu | $5.29 |
TOTAL ENERGY COSTS | $222,537 | |||
RECOMMENDED SAVINGS* | $41,571 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $17,560 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Usage | Water Disposal | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Water Usage | Water Disposal | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | Tgal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $23,879 Cost: $45,000 |
$(-2,240) | (-32,938) | - | - | $10,035 | 4,650 | $16,084 | 4,650 | - | - | - | - |
$(-2,240) (-32,938) kWh |
- - kW-months/year |
$10,035 4,650 Tgal |
$16,084 4,650 Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $12,950 Cost: $52,450 |
$10,466 | 153,300 | $2,484 | 303 | - | - | - | - | - | - | - | - |
$10,466 153,300 kWh |
$2,484 303 kW-months/year |
- - Tgal |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,028 Cost: $4,631 |
$3,028 | 44,528 | - | - | - | - | - | - | - | - | - | - |
$3,028 44,528 kWh |
- - kW-months/year |
- - Tgal |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,582 Cost: $1,600 |
$2,740 | 40,306 | - | - | - | - | - | - | $(-1,058) | - | $(-100) | - |
$2,740 40,306 kWh |
- - kW-months/year |
- - Tgal |
- - Tgal |
$(-1,058) - $ |
$(-100) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS |
Savings: $132 Cost: $474 |
$132 | 1,947 | - | - | - | - | - | - | - | - | - | - |
$132 1,947 kWh |
- - kW-months/year |
- - Tgal |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $41,571 Cost: $104,155 |
$14,126 | 207,143 | $2,484 | 303 | $10,035 | 4,650 | $16,084 | 4,650 | $(-1,058) | - | $(-100) | - | $14,126 207,143 kWh |
$2,484 303 kW-months/year |
$10,035 4,650 Tgal |
$16,084 4,650 Tgal |
$(-1,058) - $ |
$(-100) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $17,560 Cost: $58,681 |
$16,234 | 238,134 | $2,484 | 303 | - | - | - | - | $(-1,058) | - | $(-100) | - | $16,234 238,134 kWh |
$2,484 303 kW-months/year |
- - Tgal |
- - Tgal |
$(-1,058) - $ |
$(-100) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | Tgal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Usage | Water Disposal | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Water Usage | Water Disposal | Personnel Changes | Ancillary Material Cost |