IAC logo
IAC Assessment: NL0028
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0028
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2019
Principal Product Custom Molded Rubber Products
NAICS 326299 - All Other Rubber Product Manufacturing
SIC 3061 - Mechanical Rubber Goods
Sales $10,000,000-$50,000,000
# of Employees 66
Plant Area (Sq.Ft.) 60,000
Annual Production 2,500,000 Pounds
Production Hrs. Annual 6,072
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $133,125 1,955,844 kWh $0.07
Electricity Demand $30,326 3,702 kW-months/year $8.19
Electricity Fees $5,316 - $ -
Natural Gas $9,786 1,852 MMBtu $5.29
TOTAL ENERGY COSTS $222,537
RECOMMENDED SAVINGS* $41,571 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,560
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ Tgal $ $ $ $
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$23,879
Cost:
$45,000
$(-2,240) (-32,938) - - $10,035 4,650 $16,084 4,650 - - - - $(-2,240)
(-32,938)
kWh
-
-
kW-months/year
$10,035
4,650
Tgal
$16,084
4,650
Tgal
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,950
Cost:
$52,450
$10,466 153,300 $2,484 303 - - - - - - - - $10,466
153,300
kWh
$2,484
303
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,028
Cost:
$4,631
$3,028 44,528 - - - - - - - - - - $3,028
44,528
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,582
Cost:
$1,600
$2,740 40,306 - - - - - - $(-1,058) - $(-100) - $2,740
40,306
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
$(-1,058)
-
$
$(-100)
-
$
05: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$132
Cost:
$474
$132 1,947 - - - - - - - - - - $132
1,947
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$41,571
Cost:
$104,155
$14,126 207,143 $2,484 303 $10,035 4,650 $16,084 4,650 $(-1,058) - $(-100) - $14,126
207,143
kWh
$2,484
303
kW-months/year
$10,035
4,650
Tgal
$16,084
4,650
Tgal
$(-1,058)
-
$
$(-100)
-
$
TOTAL IMPLEMENTED Savings:
$17,560
Cost:
$58,681
$16,234 238,134 $2,484 303 - - - - $(-1,058) - $(-100) - $16,234
238,134
kWh
$2,484
303
kW-months/year
-
-
Tgal
-
-
Tgal
$(-1,058)
-
$
$(-100)
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ Tgal $ $ $ $
Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes Ancillary Material Cost