IAC Center University of Nebraska–Lincoln
Assessment Year 2019
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $3,600,000
# of Employees 13
Plant Area (Sq.Ft.) 180,000
Annual Production 12,410,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) IA
Source Yearly Cost Usage
Electricity Usage $62,603 1,506,400
Electricity Demand $49,740 3,322
Natural Gas $28,578 4,702
TOTAL ENERGY COSTS $140,921
RECOMMENDED SAVINGS* $17,835 *Non-energy impacts
included in savings.
IMPLEMENTED SAVINGS* -
#|Description Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW/month $ MMBtu $ $
01: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$12,000
Cost:
$102,830
- - - - - - $12,000 - -
-
kWh
-
-
kW/month
-
-
MMBtu
$12,000
-
$
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$5,716
Cost:
$22,557
- - - - $5,716 940 - - -
-
kWh
-
-
kW/month
$5,716
940
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$119
Cost:
$421
$28 663 $92 6 - - - - $28
663
kWh
$92
6
kW/month
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$17,835
Cost:
$125,808
$28 663 $92 6 $5,716 940 $12,000 - $28
663
kWh
$92
6
kW/month
$5,716
940
MMBtu
$12,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW/month
-
-
MMBtu
-
-
$
$ kWh $ kW/month $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
Back to Top