IAC Assessment: NL0031
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0031
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2019
Principal Product Ethanol
NAICS 325193 - Ethyl Alcohol Manufacturing
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 32
Plant Area (Sq.Ft.) 215,150
Annual Production 25,000 Thousand Gallons
Production Hrs. Annual 8,592
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $886,832 18,262,321 kWh $0.05
Electricity Demand $366,292 30,199 kW-months/year $12.13
Electricity Fees $2,404 - $ -
Natural Gas $1,102,401 436,129 MMBtu $2.53
TOTAL ENERGY COSTS $2,357,929
RECOMMENDED SAVINGS* $1,120,223 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,114,998
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$1,023,132
Cost:
$178,000
$(-17,699) (-361,200) $(-12,169) (-1,003) - - - - - - $1,053,000 - $(-17,699)
(-361,200)
kWh
$(-12,169)
(-1,003)
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$1,053,000
-
$
02: 2.1222 INSTALL TURBULATORS Savings:
$66,132
Cost:
$93,000
- - - - $66,132 26,160 - - - - - - -
-
kWh
-
-
kW-months/year
$66,132
26,160
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,344
Cost:
$46,600
$13,344 272,362 - - - - - - - - - - $13,344
272,362
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,390
Cost:
$24,394
$9,318 190,179 $3,072 253 - - - - - - - - $9,318
190,179
kWh
$3,072
253
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$5,225
Cost:
$1,600
- - - - $6,197 2,449 $(-472) - $(-500) - - - -
-
kWh
-
-
kW-months/year
$6,197
2,449
MMBtu
$(-472)
-
$
$(-500)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,120,223
Cost:
$343,594
$4,963 101,341 $(-9,097) (-750) $72,329 28,609 $(-472) - $(-500) - $1,053,000 - $4,963
101,341
kWh
$(-9,097)
(-750)
kW-months/year
$72,329
28,609
MMBtu
$(-472)
-
$
$(-500)
-
$
$1,053,000
-
$
TOTAL IMPLEMENTED Savings:
$1,114,998
Cost:
$341,994
$4,963 101,341 $(-9,097) (-750) $66,132 26,160 - - - - $1,053,000 - $4,963
101,341
kWh
$(-9,097)
(-750)
kW-months/year
$66,132
26,160
MMBtu
-
-
$
-
-
$
$1,053,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product