Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nebraska–Lincoln |
---|---|
Assessment Year | 2019 |
Principal Product | Industrial Boilers |
NAICS | 332410 - Power Boiler and Heat Exchanger Manufacturing |
SIC | 3443 - Fabricated Plate Work (boiler Shops) |
Sales | $100,000,000-$500,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 196,000 |
Annual Production | 400 Units |
Production Hrs. Annual | 5,500 |
Location (State) | NE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $75,328 | 2,415,091 | kWh | $0.03 |
Electricity Demand | $123,270 | 7,570 | kW-months/year | $16.28 |
Electricity Fees | $14,836 | - | $ | - |
Natural Gas | $155,374 | 25,332 | MMBtu | $6.13 |
TOTAL ENERGY COSTS | $374,463 | |||
RECOMMENDED SAVINGS* | $67,702 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $40,528 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $39,609 Cost: $71,240 |
- | - | - | - | $39,609 | 6,462 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$39,609 6,462 MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $26,635 Cost: $42,417 |
$10,342 | 333,616 | $16,293 | 1,001 | - | - | - | - | - | - | - | - |
$10,342 333,616 kWh |
$16,293 1,001 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $919 Cost: $1,000 |
$1,219 | 39,322 | - | - | - | - | - | - | $(-200) | - | $(-100) | - |
$1,219 39,322 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$(-200) - $ |
$(-100) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE |
Savings: $539 Cost: $100 |
- | - | - | - | - | - | $539 | 200 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$539 200 Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $67,702 Cost: $114,757 |
$11,561 | 372,938 | $16,293 | 1,001 | $39,609 | 6,462 | $539 | 200 | $(-200) | - | $(-100) | - | $11,561 372,938 kWh |
$16,293 1,001 kW-months/year |
$39,609 6,462 MMBtu |
$539 200 Tgal |
$(-200) - $ |
$(-100) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $40,528 Cost: $72,240 |
$1,219 | 39,322 | - | - | $39,609 | 6,462 | - | - | $(-200) | - | $(-100) | - | $1,219 39,322 kWh |
- - kW-months/year |
$39,609 6,462 MMBtu |
- - Tgal |
$(-200) - $ |
$(-100) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost |