Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nebraska–Lincoln |
---|---|
Assessment Year | 2019 |
Principal Product | Bottled Water Equipment |
NAICS | 312112 - Bottled Water Manufacturing |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 115,000 |
Annual Production | 1,100 Units |
Production Hrs. Annual | 2,730 |
Location (State) | NE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $30,495 | 850,360 | kWh | $0.04 |
Electricity Demand | $51,858 | 4,086 | kW-months/year | $12.69 |
Natural Gas | $16,458 | 1,269 | MMBtu | $12.97 |
TOTAL ENERGY COSTS | $104,874 | |||
RECOMMENDED SAVINGS* | $24,406 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,124 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Ancillary Material Cost | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $11,764 Cost: $8,337 |
$4,173 | 115,905 | $7,592 | 510 | - | - | - | - | - | - | - | - |
$4,173 115,905 kWh |
$7,592 510 kW-months/year |
- - Tgal |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $9,862 Cost: $11,390 |
$(-190) | (-5,286) | $(-448) | (-30) | - | - | - | - | - | - | $10,500 | - |
$(-190) (-5,286) kWh |
$(-448) (-30) kW-months/year |
- - Tgal |
- - $ |
- - $ |
$10,500 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,679 Cost: $4,388 |
$594 | 16,584 | $1,085 | 73 | - | - | - | - | - | - | - | - |
$594 16,584 kWh |
$1,085 73 kW-months/year |
- - Tgal |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $493 Cost: - |
- | - | - | - | $493 | 164 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$493 164 Tgal |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $248 Cost: - |
$248 | 6,924 | - | - | - | - | - | - | - | - | - | - |
$248 6,924 kWh |
- - kW-months/year |
- - Tgal |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $238 Cost: $500 |
$438 | 12,182 | - | - | - | - | $(-100) | - | $(-100) | - | - | - |
$438 12,182 kWh |
- - kW-months/year |
- - Tgal |
$(-100) - $ |
$(-100) - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $122 Cost: $275 |
$122 | 3,393 | - | - | - | - | - | - | - | - | - | - |
$122 3,393 kWh |
- - kW-months/year |
- - Tgal |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $24,406 Cost: $24,890 |
$5,384 | 149,702 | $8,229 | 552 | $493 | 164 | $(-100) | - | $(-100) | - | $10,500 | - | $5,384 149,702 kWh |
$8,229 552 kW-months/year |
$493 164 Tgal |
$(-100) - $ |
$(-100) - $ |
$10,500 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,124 Cost: $9,112 |
$4,733 | 131,480 | $7,592 | 510 | - | - | $(-100) | - | $(-100) | - | - | - | $4,733 131,480 kWh |
$7,592 510 kW-months/year |
- - Tgal |
$(-100) - $ |
$(-100) - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Ancillary Material Cost | Increase in Production |