IAC logo
IAC Assessment: NL0034
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0034
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2019
Principal Product Bottled Water Equipment
NAICS 312112 - Bottled Water Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 115,000
Annual Production 1,100 Units
Production Hrs. Annual 2,730
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $30,495 850,360 kWh $0.04
Electricity Demand $51,858 4,086 kW-months/year $12.69
Natural Gas $16,458 1,269 MMBtu $12.97
TOTAL ENERGY COSTS $104,874
RECOMMENDED SAVINGS* $24,406 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,124
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ Tgal $ $ $ $ $ %
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,764
Cost:
$8,337
$4,173 115,905 $7,592 510 - - - - - - - - $4,173
115,905
kWh
$7,592
510
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
%
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$9,862
Cost:
$11,390
$(-190) (-5,286) $(-448) (-30) - - - - - - $10,500 - $(-190)
(-5,286)
kWh
$(-448)
(-30)
kW-months/year
-
-
Tgal
-
-
$
-
-
$
$10,500
-
%
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,679
Cost:
$4,388
$594 16,584 $1,085 73 - - - - - - - - $594
16,584
kWh
$1,085
73
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
%
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$493
Cost:
-
- - - - $493 164 - - - - - - -
-
kWh
-
-
kW-months/year
$493
164
Tgal
-
-
$
-
-
$
-
-
%
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$248
Cost:
-
$248 6,924 - - - - - - - - - - $248
6,924
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
%
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$238
Cost:
$500
$438 12,182 - - - - $(-100) - $(-100) - - - $438
12,182
kWh
-
-
kW-months/year
-
-
Tgal
$(-100)
-
$
$(-100)
-
$
-
-
%
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$122
Cost:
$275
$122 3,393 - - - - - - - - - - $122
3,393
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$24,406
Cost:
$24,890
$5,384 149,702 $8,229 552 $493 164 $(-100) - $(-100) - $10,500 - $5,384
149,702
kWh
$8,229
552
kW-months/year
$493
164
Tgal
$(-100)
-
$
$(-100)
-
$
$10,500
-
%
TOTAL IMPLEMENTED Savings:
$12,124
Cost:
$9,112
$4,733 131,480 $7,592 510 - - $(-100) - $(-100) - - - $4,733
131,480
kWh
$7,592
510
kW-months/year
-
-
Tgal
$(-100)
-
$
$(-100)
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $ $ %
Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Increase in Production