IAC Assessment: NL0035
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0035
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2019
Principal Product Mining Equipment
NAICS 333131 - Mining Machinery and Equipment Manufacturing
SIC 3532 - Mining Machinery
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 210,000
Annual Production 408 Units
Production Hrs. Annual 4,966
Location (State) SD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,187 1,876,600 kWh $0.04
Electricity Demand $105,725 8,084 kW-months/year $13.08
Electricity Fees $960 - $ -
Natural Gas $59,012 11,689 MMBtu $5.05
TOTAL ENERGY COSTS $240,170
RECOMMENDED SAVINGS* $65,802 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,867
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Increase in Production Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ $ $ %
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$36,555
Cost:
$34,820
$20,545 525,249 $16,010 1,224 - - - - - - - - $20,545
525,249
kWh
$16,010
1,224
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
%
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$16,935
Cost:
$18,980
$(-597) (-15,308) $(-468) (-36) - - - - - - $18,000 - $(-597)
(-15,308)
kWh
$(-468)
(-36)
kW-months/year
-
-
$
-
-
$
-
-
$
$18,000
-
%
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$8,170
Cost:
$35,828
$3,572 91,581 $4,598 352 - - - - - - - - $3,572
91,581
kWh
$4,598
352
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
%
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$1,867
Cost:
-
- - - - - - - - $1,867 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$1,867
-
$
-
-
%
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,450
Cost:
$1,600
$1,670 42,850 - - $(-120) - $(-100) - - - - - $1,670
42,850
kWh
-
-
kW-months/year
$(-120)
-
$
$(-100)
-
$
-
-
$
-
-
%
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$825
Cost:
$2,025
$825 21,159 - - - - - - - - - - $825
21,159
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$65,802
Cost:
$93,253
$26,015 665,531 $20,140 1,540 $(-120) - $(-100) - $1,867 - $18,000 - $26,015
665,531
kWh
$20,140
1,540
kW-months/year
$(-120)
-
$
$(-100)
-
$
$1,867
-
$
$18,000
-
%
TOTAL IMPLEMENTED Savings:
$48,867
Cost:
$74,273
$26,612 680,839 $20,608 1,576 $(-120) - $(-100) - $1,867 - - - $26,612
680,839
kWh
$20,608
1,576
kW-months/year
$(-120)
-
$
$(-100)
-
$
$1,867
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Increase in Production Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Increase in Production