IAC logo
IAC Assessment: NL0044
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0044
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2020
Principal Product Instruments, Analysis Software, and Reagents
NAICS 334519 - Other Measuring and Controlling Device Manufacturing
SIC 3829 - Measuring & Controlling Devices, Nec
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 200,000
Annual Production 2,000,000 Units
Production Hrs. Annual 2,550
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $165,886 3,832,127 kWh $0.04
Electricity Demand $74,153 9,262 kW-months/year $8.01
Electricity Fees $46,334 - $ -
Natural Gas $54,490 7,657 MMBtu $7.12
TOTAL ENERGY COSTS $348,383
RECOMMENDED SAVINGS* $15,030 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,052
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,951
Cost:
$29,928
$5,859 135,354 $5,091 637 - - - - - - $5,859
135,354
kWh
$5,091
637
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,983
Cost:
$20
$955 22,050 $2,102 263 $(-1,074) (-151) - - - - $955
22,050
kWh
$2,102
263
kW-months/year
$(-1,074)
(-151)
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,007
Cost:
$1,000
$1,187 27,426 - - - - $(-160) - $(-20) - $1,187
27,426
kWh
-
-
kW-months/year
-
-
MMBtu
$(-160)
-
$
$(-20)
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$693
Cost:
$1,400
$693 16,017 - - - - - - - - $693
16,017
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$285
Cost:
$20
$285 6,588 - - - - - - - - $285
6,588
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$111
Cost:
$50
$111 2,574 - - - - - - - - $111
2,574
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$15,030
Cost:
$32,418
$9,090 210,009 $7,193 900 $(-1,074) (-151) $(-160) - $(-20) - $9,090
210,009
kWh
$7,193
900
kW-months/year
$(-1,074)
(-151)
MMBtu
$(-160)
-
$
$(-20)
-
$
TOTAL IMPLEMENTED Savings:
$14,052
Cost:
$30,998
$8,112 187,404 $7,193 900 $(-1,074) (-151) $(-160) - $(-20) - $8,112
187,404
kWh
$7,193
900
kW-months/year
$(-1,074)
(-151)
MMBtu
$(-160)
-
$
$(-20)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost