Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2020
Principal Product Custom Metal Parts
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3449 - Miscellaneous Metal Work
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 220,000
Annual Production 3,500 Tons
Production Hrs. Annual 2,500
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,131 3,987,427 kWh $0.03
Electricity Demand $194,145 10,907 kW-months/year $17.80
Electricity Fees $74,801 - $ -
Natural Gas $151,354 27,512 MMBtu $5.50
TOTAL ENERGY COSTS $540,747
RECOMMENDED SAVINGS* $25,482 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,477
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$11,815
Cost:
$4,420
$1,580 58,700 $10,235 575 - - - - - - - - $1,580
58,700
kWh
$10,235
575
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT Savings:
$5,190
Cost:
$6,320
- - - - $5,190 944 - - - - - - -
-
kWh
-
-
kW-months/year
$5,190
944
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 3.4155 METER WASTE WATER Savings:
$4,017
Cost:
$580
- - - - - - $4,017 1,553 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,017
1,553
Tgal
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,375
Cost:
$2,354
$1,146 42,430 $1,230 69 - - - - - - - - $1,146
42,430
kWh
$1,230
69
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,620
Cost:
$2,000
$2,280 84,409 - - - - - - $(-560) - $(-100) - $2,280
84,409
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-560)
-
$
$(-100)
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$465
Cost:
$2,000
$465 17,275 - - - - - - - - - - $465
17,275
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$25,482
Cost:
$17,674
$5,471 202,814 $11,465 644 $5,190 944 $4,017 1,553 $(-560) - $(-100) - $5,471
202,814
kWh
$11,465
644
kW-months/year
$5,190
944
MMBtu
$4,017
1,553
Tgal
$(-560)
-
$
$(-100)
-
$
TOTAL IMPLEMENTED Savings:
$8,477
Cost:
$6,934
$3,891 144,114 $1,230 69 - - $4,017 1,553 $(-560) - $(-100) - $3,891
144,114
kWh
$1,230
69
kW-months/year
-
-
MMBtu
$4,017
1,553
Tgal
$(-560)
-
$
$(-100)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost