IAC logo
IAC Assessment: NL0068
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0068
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2022
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 11
Plant Area (Sq.Ft.) 160,000
Annual Production 1,118,100 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $182,657 4,684,533 kWh $0.04
Electricity Demand $143,221 8,459 kW-months/year $16.93
Electricity Fees $1,740 - $ -
Natural Gas $6,868 1,089 MMBtu $6.31
TOTAL ENERGY COSTS $334,486
RECOMMENDED SAVINGS* $88,573 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $88,573
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Electricity Usage Electricity Demand Water Usage
$ kWh $ kW-months/year $ Tgal
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$44,258
Cost:
$7,000
$19,233 493,452 $25,025 1,478 - - $19,233
493,452
kWh
$25,025
1,478
kW-months/year
-
-
Tgal
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$20,357
Cost:
$960
$20,357 521,968 - - - - $20,357
521,968
kWh
-
-
kW-months/year
-
-
Tgal
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$17,011
Cost:
$25,884
$612 15,705 $1,595 94 $14,804 9,370 $612
15,705
kWh
$1,595
94
kW-months/year
$14,804
9,370
Tgal
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,339
Cost:
$4,500
$3,348 85,848 $1,991 118 - - $3,348
85,848
kWh
$1,991
118
kW-months/year
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,608
Cost:
$5,394
$398 10,208 $1,210 71 - - $398
10,208
kWh
$1,210
71
kW-months/year
-
-
Tgal
TOTAL RECOMMENDED Savings:
$88,573
Cost:
$43,738
$43,948 1,127,181 $29,821 1,761 $14,804 9,370 $43,948
1,127,181
kWh
$29,821
1,761
kW-months/year
$14,804
9,370
Tgal
TOTAL IMPLEMENTED Savings:
$88,573
Cost:
$43,738
$43,948 1,127,181 $29,821 1,761 $14,804 9,370 $43,948
1,127,181
kWh
$29,821
1,761
kW-months/year
$14,804
9,370
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Usage Electricity Usage Electricity Demand Water Usage