Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nebraska–Lincoln |
---|---|
Assessment Year | 2022 |
Principal Product | Treated Wastewater |
NAICS | 221320 - Sewage Treatment Facilities |
SIC | 4952 - Sewerage Systems |
Sales | $1,000,000-$5,000,000 |
# of Employees | 11 |
Plant Area (Sq.Ft.) | 160,000 |
Annual Production | 1,118,100 Thousand Gallons |
Production Hrs. Annual | 8,760 |
Location (State) | NE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $182,657 | 4,684,533 | kWh | $0.04 |
Electricity Demand | $143,221 | 8,459 | kW-months/year | $16.93 |
Electricity Fees | $1,740 | - | $ | - |
Natural Gas | $6,868 | 1,089 | MMBtu | $6.31 |
TOTAL ENERGY COSTS | $334,486 | |||
RECOMMENDED SAVINGS* | $88,573 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $88,573 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Usage | Electricity Usage | Electricity Demand | Water Usage | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $44,258 Cost: $7,000 |
$19,233 | 493,452 | $25,025 | 1,478 | - | - |
$19,233 493,452 kWh |
$25,025 1,478 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $20,357 Cost: $960 |
$20,357 | 521,968 | - | - | - | - |
$20,357 521,968 kWh |
- - kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $17,011 Cost: $25,884 |
$612 | 15,705 | $1,595 | 94 | $14,804 | 9,370 |
$612 15,705 kWh |
$1,595 94 kW-months/year |
$14,804 9,370 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $5,339 Cost: $4,500 |
$3,348 | 85,848 | $1,991 | 118 | - | - |
$3,348 85,848 kWh |
$1,991 118 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,608 Cost: $5,394 |
$398 | 10,208 | $1,210 | 71 | - | - |
$398 10,208 kWh |
$1,210 71 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $88,573 Cost: $43,738 |
$43,948 | 1,127,181 | $29,821 | 1,761 | $14,804 | 9,370 | $43,948 1,127,181 kWh |
$29,821 1,761 kW-months/year |
$14,804 9,370 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $88,573 Cost: $43,738 |
$43,948 | 1,127,181 | $29,821 | 1,761 | $14,804 | 9,370 | $43,948 1,127,181 kWh |
$29,821 1,761 kW-months/year |
$14,804 9,370 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Usage | Electricity Usage | Electricity Demand | Water Usage |