IAC logo
IAC Assessment: NL0072
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0072
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2022
Principal Product Anhydrous Ammonia
NAICS 325311 - Nitrogenous Fertilizer Manufacturing
SIC 2873 - Nitrogenous Fertilizers
Sales $10,000,000-$50,000,000
# of Employees 33
Plant Area (Sq.Ft.) 1,655,000
Annual Production 38,325 Tons
Production Hrs. Annual 8,760
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,025,068 37,575,796 kWh $0.03
Electricity Demand $410,642 163,972 kW-months/year $2.50
Electricity Fees $185,455 - $ -
Natural Gas $4,963,063 1,333,862 MMBtu $3.72
TOTAL ENERGY COSTS $6,585,567
RECOMMENDED SAVINGS* $34,555 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,782
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Primary Product Electricity Usage Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Primary Product
$ kWh $ MMBtu $ gal $ $ $ $ $ $ $ $
01: 2.1224 REPLACE BOILER Savings:
$18,966
Cost:
$23,925
$5,137 188,180 $13,795 3,528 $34 705,600 - - - - - - - - $5,137
188,180
kWh
$13,795
3,528
MMBtu
$34
705,600
gal
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,761
Cost:
$20,400
$3,659 134,028 - - - - $420 - $3,700 - - - $4,982 - $3,659
134,028
kWh
-
-
MMBtu
-
-
gal
$420
-
$
$3,700
-
$
-
-
$
$4,982
-
$
03: 2.2128 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) Savings:
$2,055
Cost:
$266
- - $1,693 433 - - - - - - $362 - - - -
-
kWh
$1,693
433
MMBtu
-
-
gal
-
-
$
-
-
$
$362
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$773
Cost:
$1,445
$773 28,324 - - - - - - - - - - - - $773
28,324
kWh
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$34,555
Cost:
$46,036
$9,569 350,532 $15,488 3,961 $34 705,600 $420 - $3,700 - $362 - $4,982 - $9,569
350,532
kWh
$15,488
3,961
MMBtu
$34
705,600
gal
$420
-
$
$3,700
-
$
$362
-
$
$4,982
-
$
TOTAL IMPLEMENTED Savings:
$33,782
Cost:
$44,591
$8,796 322,208 $15,488 3,961 $34 705,600 $420 - $3,700 - $362 - $4,982 - $8,796
322,208
kWh
$15,488
3,961
MMBtu
$34
705,600
gal
$420
-
$
$3,700
-
$
$362
-
$
$4,982
-
$
Savings
Cost
$ kWh $ MMBtu $ gal $ $ $ $ $ $ $ $
Electricity Usage Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Primary Product Electricity Usage Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Primary Product