Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nebraska–Lincoln |
---|---|
Assessment Year | 2022 |
Principal Product | Pet Food Cans |
NAICS | 332431 - Metal Can Manufacturing |
SIC | 3411 - Metal Cans |
Sales | $50,000,000-$100,000,000 |
# of Employees | 179 |
Plant Area (Sq.Ft.) | 500,300 |
Annual Production | 500,000,000 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $800,202 | 18,491,595 | kWh | $0.04 |
Electricity Demand | $134,129 | 28,814 | kW-months/year | $4.65 |
Electricity Fees | $177,929 | - | $ | - |
Natural Gas | $220,147 | 30,435 | MMBtu | $7.23 |
TOTAL ENERGY COSTS | $1,332,407 | |||
RECOMMENDED SAVINGS* | $97,578 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $20,788 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $42,345 Cost: $20,000 |
$36,875 | 857,558 | $5,470 | 1,175 | - | - | - | - | - | - |
$36,875 857,558 kWh |
$5,470 1,175 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $24,481 Cost: $25,000 |
- | - | - | - | $24,481 | 3,385 | - | - | - | - |
- - kWh |
- - kW-months/year |
$24,481 3,385 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $10,256 Cost: $4,500 |
$10,916 | 253,869 | - | - | - | - | $(-560) | - | $(-100) | - |
$10,916 253,869 kWh |
- - kW-months/year |
- - MMBtu |
$(-560) - $ |
$(-100) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $7,880 Cost: $12,650 |
$7,880 | 183,254 | - | - | - | - | - | - | - | - |
$7,880 183,254 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $6,194 Cost: $140 |
$6,194 | 144,027 | - | - | - | - | - | - | - | - |
$6,194 144,027 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $4,338 Cost: $7,210 |
- | - | - | - | $4,338 | 600 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,338 600 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $2,084 Cost: $35 |
- | - | $2,084 | 448 | - | - | - | - | - | - |
- - kWh |
$2,084 448 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $97,578 Cost: $69,535 |
$61,865 | 1,438,708 | $7,554 | 1,623 | $28,819 | 3,985 | $(-560) | - | $(-100) | - | $61,865 1,438,708 kWh |
$7,554 1,623 kW-months/year |
$28,819 3,985 MMBtu |
$(-560) - $ |
$(-100) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $20,788 Cost: $11,850 |
$17,110 | 397,896 | - | - | $4,338 | 600 | $(-560) | - | $(-100) | - | $17,110 397,896 kWh |
- - kW-months/year |
$4,338 600 MMBtu |
$(-560) - $ |
$(-100) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |