IAC Assessment: NL0077
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0077
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2023
Principal Product Excavation and Mining Equipment
NAICS 333131 - Mining Machinery and Equipment Manufacturing
SIC 3532 - Mining Machinery
Sales $100,000,000-$500,000,000
# of Employees 450
Plant Area (Sq.Ft.) 360,000
Annual Production 95 Units
Production Hrs. Annual 6,864
Location (State) SD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $294,483 5,222,750 kWh $0.06
Electricity Demand $197,992 15,736 kW-months/year $12.58
Electricity Fees $31,402 - $ -
Natural Gas $213,415 60,103 MMBtu $3.55
TOTAL ENERGY COSTS $751,109
RECOMMENDED SAVINGS* $319,149 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $129,701
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Increase in Production Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Increase in Production
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $ $ %
01: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$150,762
Cost:
$690,000
$(-1,129) (-20,160) - - - - $4,200 - - - - - $147,691 - $(-1,129)
(-20,160)
kWh
-
-
kW-months/year
-
-
MMBtu
$4,200
-
$
-
-
$
-
-
$
$147,691
-
%
02: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$121,895
Cost:
$4,200
- - - - - - $9,435 - $116,660 - $(-4,200) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$9,435
-
$
$116,660
-
$
$(-4,200)
-
$
-
-
%
03: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$36,689
Cost:
$350
- - $36,689 2,916 - - - - - - - - - - -
-
kWh
$36,689
2,916
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
%
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,279
Cost:
$4,500
$7,939 141,768 - - - - $(-560) - $(-100) - - - - - $7,939
141,768
kWh
-
-
kW-months/year
-
-
MMBtu
$(-560)
-
$
$(-100)
-
$
-
-
$
-
-
%
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,997
Cost:
$470
- - - - $1,997 563 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,997
563
MMBtu
-
-
$
-
-
$
-
-
$
-
-
%
06: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$527
Cost:
$200
- - - - $527 149 - - - - - - - - -
-
kWh
-
-
kW-months/year
$527
149
MMBtu
-
-
$
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$319,149
Cost:
$699,720
$6,810 121,608 $36,689 2,916 $2,524 711 $13,075 - $116,560 - $(-4,200) - $147,691 - $6,810
121,608
kWh
$36,689
2,916
kW-months/year
$2,524
711
MMBtu
$13,075
-
$
$116,560
-
$
$(-4,200)
-
$
$147,691
-
%
TOTAL IMPLEMENTED Savings:
$129,701
Cost:
$8,900
$7,939 141,768 - - $527 149 $8,875 - $116,560 - $(-4,200) - - - $7,939
141,768
kWh
-
-
kW-months/year
$527
149
MMBtu
$8,875
-
$
$116,560
-
$
$(-4,200)
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Increase in Production Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Increase in Production