IAC Assessment: NL0080
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0080
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2023
Principal Product Tools, Dies, Plastic Fixtures
NAICS 333511 - Industrial Mold Manufacturing
SIC 3544 - Special Dies, Tools, Jigs & Fixtures
Sales $10,000,000-$50,000,000
# of Employees 62
Plant Area (Sq.Ft.) 38,000
Annual Production 720,000,000 Units
Production Hrs. Annual 6,240
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $34,961 1,388,499 kWh $0.03
Electricity Demand $60,685 3,757 kW-months/year $16.15
Electricity Fees $5,019 - $ -
Natural Gas $3,938 297 MMBtu $13.26
TOTAL ENERGY COSTS $105,080
RECOMMENDED SAVINGS* $23,788 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ %
01: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$7,794
Cost:
$120
$4,053 162,120 $3,741 232 - - - - - - $4,053
162,120
kWh
$3,741
232
kW-months/year
-
-
$
-
-
$
-
-
%
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$7,690
Cost:
$38,085
$364 14,540 $1,326 82 - - - - $6,000 - $364
14,540
kWh
$1,326
82
kW-months/year
-
-
$
-
-
$
$6,000
-
%
03: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$4,846
Cost:
$4,160
- - $4,846 300 - - - - - - -
-
kWh
$4,846
300
kW-months/year
-
-
$
-
-
$
-
-
%
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,163
Cost:
$4,000
$352 14,083 $696 43 $115 - - - - - $352
14,083
kWh
$696
43
kW-months/year
$115
-
$
-
-
$
-
-
%
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$761
Cost:
$560
$761 30,444 - - - - - - - - $761
30,444
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
%
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$754
Cost:
$660
$1,334 53,378 - - $(-480) - $(-100) - - - $1,334
53,378
kWh
-
-
kW-months/year
$(-480)
-
$
$(-100)
-
$
-
-
%
07: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$423
Cost:
$844
$423 16,924 - - - - - - - - $423
16,924
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
%
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$186
Cost:
$420
$12 488 $11 1 $163 - - - - - $12
488
kWh
$11
1
kW-months/year
$163
-
$
-
-
$
-
-
%
09: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$171
Cost:
$80
$171 6,836 - - - - - - - - $171
6,836
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$23,788
Cost:
$48,929
$7,470 298,813 $10,621 658 $(-202) - $(-100) - $6,000 - $7,470
298,813
kWh
$10,621
658
kW-months/year
$(-202)
-
$
$(-100)
-
$
$6,000
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ %
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production