Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nebraska–Lincoln |
---|---|
Assessment Year | 2023 |
Principal Product | Drywall Components |
NAICS | 332311 - Prefabricated Metal Building and Component Manufacturing |
SIC | 3448 - Prefabricated Metal Buildings |
Sales | $50,000,000-$100,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 140,000 |
Annual Production | 166,400 Thousand Feet |
Production Hrs. Annual | 6,000 |
Location (State) | NE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $111,394 | 1,774,080 | kWh | $0.06 |
Electricity Demand | $28,234 | 5,041 | kW-months/year | $5.60 |
Electricity Fees | $5,019 | - | $ | - |
Natural Gas | $11,273 | 1,292 | MMBtu | $8.72 |
TOTAL ENERGY COSTS | $157,028 | |||
RECOMMENDED SAVINGS* | $530,352 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $519,239 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $497,815 Cost: $199,200 |
$5,339 | 86,114 | $1,655 | 295 | - | - | - | - | $490,821 | - |
$5,339 86,114 kWh |
$1,655 295 kW-months/year |
- - $ |
- - $ |
$490,821 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $15,605 Cost: $20,000 |
$513 | 8,220 | $92 | 16 | - | - | - | - | $15,000 | - |
$513 8,220 kWh |
$92 16 kW-months/year |
- - $ |
- - $ |
$15,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $7,826 Cost: $12,000 |
$6,628 | 106,911 | $1,198 | 214 | - | - | - | - | - | - |
$6,628 106,911 kWh |
$1,198 214 kW-months/year |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,819 Cost: $5,000 |
$6,559 | 105,792 | - | - | $(-640) | - | $(-100) | - | - | - |
$6,559 105,792 kWh |
- - kW-months/year |
$(-640) - $ |
$(-100) - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,139 Cost: $3,320 |
$2,139 | 34,500 | - | - | - | - | - | - | - | - |
$2,139 34,500 kWh |
- - kW-months/year |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS |
Savings: $937 Cost: $1,210 |
$937 | 15,119 | - | - | - | - | - | - | - | - |
$937 15,119 kWh |
- - kW-months/year |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $157 Cost: $225 |
$59 | 946 | $7 | 1 | $91 | - | - | - | - | - |
$59 946 kWh |
$7 1 kW-months/year |
$91 - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $54 Cost: $57 |
$54 | 868 | - | - | - | - | - | - | - | - |
$54 868 kWh |
- - kW-months/year |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $530,352 Cost: $241,012 |
$22,228 | 358,470 | $2,952 | 527 | $(-549) | - | $(-100) | - | $505,821 | - | $22,228 358,470 kWh |
$2,952 527 kW-months/year |
$(-549) - $ |
$(-100) - $ |
$505,821 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $519,239 Cost: $224,200 |
$12,411 | 200,126 | $1,747 | 312 | $(-640) | - | $(-100) | - | $505,821 | - | $12,411 200,126 kWh |
$1,747 312 kW-months/year |
$(-640) - $ |
$(-100) - $ |
$505,821 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Increase in Production |