IAC logo
IAC Assessment: NL0090
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0090
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2023
Principal Product Grain Dryer
NAICS 333111 - Farm Machinery and Equipment Manufacturing
SIC 3523 - Farm Machinery And Equipment
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 351,000
Annual Production 200 Units
Production Hrs. Annual 4,080
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $93,411 1,515,904 kWh $0.06
Electricity Demand $22,219 4,130 kW-months/year $5.38
Electricity Fees $7,443 - $ -
Natural Gas $75,928 9,555 MMBtu $7.95
TOTAL ENERGY COSTS $205,614
RECOMMENDED SAVINGS* $28,454 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ %
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$10,602
Cost:
$19,848
$320 5,161 $82 15 - - - - $10,200 - $320
5,161
kWh
$82
15
kW-months/year
-
-
$
-
-
$
$10,200
-
%
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,629
Cost:
$7,670
$6,214 100,130 $1,415 263 - - - - - - $6,214
100,130
kWh
$1,415
263
kW-months/year
-
-
$
-
-
$
-
-
%
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,382
Cost:
$4,500
$6,042 97,548 - - $(-560) - $(-100) - - - $6,042
97,548
kWh
-
-
kW-months/year
$(-560)
-
$
$(-100)
-
$
-
-
%
04: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$3,454
Cost:
$1,764
$3,454 55,701 - - - - - - - - $3,454
55,701
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
%
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$822
Cost:
$1,190
$638 10,293 $184 34 - - - - - - $638
10,293
kWh
$184
34
kW-months/year
-
-
$
-
-
$
-
-
%
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$565
Cost:
$831
$228 3,680 $27 5 $310 - - - - - $228
3,680
kWh
$27
5
kW-months/year
$310
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$28,454
Cost:
$35,803
$16,896 272,513 $1,708 317 $(-250) - $(-100) - $10,200 - $16,896
272,513
kWh
$1,708
317
kW-months/year
$(-250)
-
$
$(-100)
-
$
$10,200
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ %
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production