IAC Assessment: NL0091
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0091
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2023
Principal Product Roof Trusses
NAICS 321918 - Other Millwork (including Flooring)
SIC 2439 - Structural Wood Members, Nec
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 290,000
Annual Production 12,500 Thousand Feet
Production Hrs. Annual 5,250
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $51,742 1,973,293 kWh $0.03
Electricity Demand $76,464 4,468 kW-months/year $17.11
Electricity Fees $10,492 - $ -
Natural Gas $177,671 13,306 MMBtu $13.35
TOTAL ENERGY COSTS $316,369
RECOMMENDED SAVINGS* $46,712 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,989
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ %
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$28,330
Cost:
$57,285
$(-479) (-18,270) $(-1,191) (-70) - - - - $30,000 - $(-479)
(-18,270)
kWh
$(-1,191)
(-70)
kW-months/year
-
-
$
-
-
$
$30,000
-
%
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,289
Cost:
$11,473
$6,534 249,375 $9,755 570 - - - - - - $6,534
249,375
kWh
$9,755
570
kW-months/year
-
-
$
-
-
$
-
-
%
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,370
Cost:
$1,500
$1,726 65,888 - - $(-256) - $(-100) - - - $1,726
65,888
kWh
-
-
kW-months/year
$(-256)
-
$
$(-100)
-
$
-
-
%
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$507
Cost:
$1,064
$105 3,994 $94 6 $308 - - - - - $105
3,994
kWh
$94
6
kW-months/year
$308
-
$
-
-
$
-
-
%
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$216
Cost:
$128
$216 8,245 - - - - - - - - $216
8,245
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$46,712
Cost:
$71,450
$8,102 309,232 $8,658 506 $52 - $(-100) - $30,000 - $8,102
309,232
kWh
$8,658
506
kW-months/year
$52
-
$
$(-100)
-
$
$30,000
-
%
TOTAL IMPLEMENTED Savings:
$45,989
Cost:
$70,258
$7,781 296,993 $8,564 500 $(-256) - $(-100) - $30,000 - $7,781
296,993
kWh
$8,564
500
kW-months/year
$(-256)
-
$
$(-100)
-
$
$30,000
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ %
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production