IAC logo
IAC Assessment: NL0092
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0092
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2023
Principal Product Corrugated Boxes
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 69
Plant Area (Sq.Ft.) 257,000
Annual Production 200,000 Thousand Feet
Production Hrs. Annual 2,000
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $105,425 1,446,310 kWh $0.07
Electricity Demand $97,046 8,205 kW-months/year $11.83
Electricity Fees $26,052 - $ -
Natural Gas $96,604 10,000 MMBtu $9.66
TOTAL ENERGY COSTS $325,954
RECOMMENDED SAVINGS* $23,891 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$12,092
Cost:
$3,305
$6,798 93,250 $5,294 448 - - - - - - $6,798
93,250
kWh
$5,294
448
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,380
Cost:
$140
- - $8,800 744 - - $(-420) - - - -
-
kWh
$8,800
744
kW-months/year
-
-
$
$(-420)
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,226
Cost:
$2,000
$1,746 23,956 - - - - $(-420) - $(-100) - $1,746
23,956
kWh
-
-
kW-months/year
-
-
$
$(-420)
-
$
$(-100)
-
$
04: 2.8112 COMBINE UTILITY METERS Savings:
$948
Cost:
$1,000
- - - - $948 - - - - - -
-
kWh
-
-
kW-months/year
$948
-
$
-
-
$
-
-
$
05: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT Savings:
$665
Cost:
$1,360
- - - - - - $665 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$665
-
$
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$580
Cost:
$105
$580 7,951 - - - - - - - - $580
7,951
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$23,891
Cost:
$7,910
$9,124 125,157 $14,094 1,192 $948 - $(-175) - $(-100) - $9,124
125,157
kWh
$14,094
1,192
kW-months/year
$948
-
$
$(-175)
-
$
$(-100)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost